Steve3186

I’ve had an electrician rewire my house.
Is it normal for him to leave it like this…


Also, some switched were the wrong way round.

Is this normal to leave it like this for me to sort out or should they at least clean the plaster splashes off?
 

Attachments

  • A8C3C74A-16E3-431B-9632-FF4D0BDDA648.jpeg
    A8C3C74A-16E3-431B-9632-FF4D0BDDA648.jpeg
    321 KB · Views: 286
  • 800796A6-2C78-455D-9DA9-A8A47F7E4011.jpeg
    800796A6-2C78-455D-9DA9-A8A47F7E4011.jpeg
    423.4 KB · Views: 285
  • A407CFF1-76DB-4010-AEE7-CF12A7F20EAC.jpeg
    A407CFF1-76DB-4010-AEE7-CF12A7F20EAC.jpeg
    605.6 KB · Views: 273
all depends on what agreement you had regarding making good. from the pics, that's usually how most would leave it, for a plasterer to skim and the decorator ( paid contractor or yourself) to paint/paper .
 
Looks similar to how I've left plenty of re wires. Enough plaster to hold the fittings in place and leave useable and safe, but I'm not a plasterer or decorator.
Should have been made clear before the job started, though.
 
Unless the electrician stated when quoting and when the quote was accepted that they would not be patching the walls and ceiling to a good standard, then the customer can only assume that it would be patched to a standard suitable for decorating.

What's been left is unacceptable, regardless of what may or may not have been said.

It should either have been plastered to a good standard or not at all.
A plasterer would not want to touch that, it would take more time to sort out thatit would to remove it all and do it correctly.
 
After a closer look at the pics, it looks like the electrician HAS attempted to do the plastering, and has gone way past his skill set. If he wanted to make good, he should have used 'one coat', which is a lot easier for a non skilled person to get an acceptable finish, especially if wall paper is being added.
 
  • Like
Reactions: Algarve Sparky
The general idea is that you would apply a bonding coat that fills the chases and shrinks back slightly ready for a skim coat by a plasterer etc. it's not always done and can just be left with conduit or capping on show. I wouldn't expect gaps that large if I had agreed for the chases to be filled with finishing by others. Communication with trades is usually a headache in my experience. Has the ceiling been plastered before the electrical work?
 
  • Agree
Reactions: Vortigern
Unless he has specifically stated in the agreement about making good/painting then is is absolutley normal. More than some would do actually
 
I remember finishing off a rewire of lights
The chaps girlfriend for tieland was patching up behind me with butter knife and fork, boy only thing was missing was the dinner.
You get what you paid for.
 
It should have been discussed, however if he said that he was making good, he should have tried to put some finish on it, having said that plastering is a very skilled job.
 
I wonder why the ceiling rose doesn't cover the hole
 
  • Like
Reactions: DPG
What I don't get is why is all the wet plaster splashed all up the wall ?

Pictures 2 & 3 look like the sparks applied the plaster with snow shovel
Used a catapult more like
 
To the OP , I'm just wondering if you received an Installation Certificate and Part P compliance Certificate for this rewiring work ? Note what appear to be 'Lap' accessories too.
 
  • Like
Reactions: DPG
Lap accessories are always a big red flag for me. 9 times out of 10 equals crap work. Not always though
 
Agreed. As soon as I see lap I expect DIY or cheap job
 
All seems ok, sockets are @ original height not 450mm, which is fine too.
 
  • Like
Reactions: Deleted account
There’s even a splash of plaster on the lamp holder, which is some feat in itself.

I have to echo the above comments. Electricians are not plasterers…. You want the job done right, you get the right tradesperson to do each job.
Could have been a bit neater, though
 
  • Like
Reactions: Deleted account
Because, like me, he insists on screwing light fittings securely to a joist.
Why not put the hole beside the joist? Or fitting a ground? Doesn't absolutley have to be secured to the joist
 
  • Like
Reactions: Dave OCD

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
Paid electrician, is this right or normal?
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
65

Advert

Thread statistics

Created
Steve3186,
Last reply from
captaincaveman,
Replies
65
Views
6,888

Advert