Just looking for abit of advice newly qualified spark (only ever done new builds this is my first private job) and I’m doing a job for a neighbour and there’s wanting supply to supply and garage and then the shed supplying aswell and was wondering if I I can get away with just running one supply they’ve got a hot tub only a 13A at the minute but considering upgrading to 32A in the future
and this was going to be my approach and was wondering if this would be ok
40A mcb from the house to garage installing a consumer in the garage
Sockets 16A
Lights 6A
Hot tub 32A
32A shed: then running a 6mm to shed and installing another comsumer in the shed there will be a few lights and sockets and a couple of pumps for the bar area
Any comments and advice will be greatly appreciated seems abit silly posting this thread
and this was going to be my approach and was wondering if this would be ok
40A mcb from the house to garage installing a consumer in the garage
Sockets 16A
Lights 6A
Hot tub 32A
32A shed: then running a 6mm to shed and installing another comsumer in the shed there will be a few lights and sockets and a couple of pumps for the bar area
Any comments and advice will be greatly appreciated seems abit silly posting this thread