Hi chaps , been testing some pc set ups. Each station has a pc supplied with a standard 3 pin iec , and a monitor with a standard 3 pin iec.
Been testing the cords separate for earth continuity, insulation and polarity. Then i connect cords and then test again, pc for earth bond at 100mA, insulation at 250 then touch test, then monitor tft for insulation,then touch test. (cant get good earth bond as majority plastic)..
So in all four tests per station.
Would you carry out the same tests or more/less???
Cheers