J
JPS999
Hi to all, I am in the process of constructing a garden office the wall consist of 4 x 2 .... studwork this is to filled with celotex n the inner side is a vapour barrier then 12.5 plastebard.. on the outside is a breathable membrane the 2 x1 battons then cladding do I run. the cables through .the insultion or between the outside cladding and the battons