- Jul 8, 2013
- 750
- 467
- 138
- If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
- United Kingdom
- What type of forum member are you?
- Practising Electrician (Qualified - Domestic or Commercial etc)
Thoughts required on todays scenario .
Commercial premises fed from 100 amp 3 phase TNS supply ZE 0.40
feeds 80 amp 3 phase switch fuse (max zs 0.57)
feeds 400 amp mainswitch protek panel in 35mm swa 16mm earth
125 amp mccb (0.24 max zs) submain exceeds max zs at 0.57
Had this down as a code 2 but max zs of 80 amp switch fuse will disconnect in under 5 seconds ....
Dogs dinner of a set up , any one in agreement of my code 3 ????
Commercial premises fed from 100 amp 3 phase TNS supply ZE 0.40
feeds 80 amp 3 phase switch fuse (max zs 0.57)
feeds 400 amp mainswitch protek panel in 35mm swa 16mm earth
125 amp mccb (0.24 max zs) submain exceeds max zs at 0.57
Had this down as a code 2 but max zs of 80 amp switch fuse will disconnect in under 5 seconds ....
Dogs dinner of a set up , any one in agreement of my code 3 ????