Some DNO's were permitting registered persons to pull the fuse and were given seals to reinstate.


Many new installations and meter replacements are now supplied with a "self connect" meter.

One side is sealed with the incomming tails and the other has a slot for a screwdriver to isolate and a screw on cover so that we can connect our tails when we are ready.

On the subject of 1361 fuses & carriers.

Although they are marked 100A, this is the rating of the carrier and NOT whats always inside.

A bit like a plug top.
 
Some DNO's were permitting registered persons to pull the fuse and were given seals to reinstate.


Many new installations and meter replacements are now supplied with a "self connect" meter.

One side is sealed with the incomming tails and the other has a slot for a screwdriver to isolate and a screw on cover so that we can connect our tails when we are ready.

On the subject of 1361 fuses & carriers.

Although they are marked 100A, this is the rating of the carrier and NOT whats always inside.

A bit like a plug top.

As with many things, a shame these "self connect" meters aren't more widely available and used. At least we know they have a potential "solution" out there.

And a very valid point about cut out fuses too!

I cam across a NEW style incomer with the new white finish recently, clearly labelled 100A.....NOT sealed, as the new head was put in ahead of EIC testing......Yet, a quick look showed that they'd refitted the original 60A fuse in the carrier......d'oh.

They also quoted three weeks to the sparks in question to come out and replace it with a 100A fuse, which was the whole point of changing the thing in the first place.
 
Must admit, i have built up a good relationship with my local "jointers" and if they have a new style meter on the van, they will fit that for me, especially if im not ready to connect.

If not, they let me have a few seals that i can use when im done.

They even let me do my own PME conversions from TT if its available :D
 
How long do you think this Mess will be Cleared up .
Although they are marked 100A, this is the rating of the carrier and NOT what’s always inside.. Your Right

Accordfire . ahead of EIC testing......Yet, a quick look showed that they'd refitted the original 60A fuse in the carrier......d'oh.
quoted three weeks to the sparks in question to come out and replace it with a 100A fuse,

To much Red Tape Here I feel . This has to come to Light. Somewhere .
 
Must admit, i have built up a good relationship with my local "jointers" and if they have a new style meter on the van, they will fit that for me, especially if im not ready to connect.

If not, they let me have a few seals that i can use when im done.

They even let me do my own PME conversions from TT if its available :D

Had a bag of seals and a crimp donated many years ago....sadly all long used up now.

Never see the same face twice down here, and London's a joke....even the jointers don't have seals half the time lol!

If only change was easy, huh?

(PM'd you BTW, when u get a minute)....no rush.
 
british gas get unitied utilities to fit 100A isolator, meter, and tails on there side for £39 whichever of the three you need done or all its one price £39
 
Accordfire . Sorry about this you set me OFF in one “ Knowledge “ Old Amber . so my books are Out .

Fact of Fiction

The Supply Authority are duty bound On Enquiry to tell you what System you have . Although it Often takes some Persistence to get them to tell you as often they need to send someone Out to Test & of course that Cost them Money . ( Can you Confirm this Please )

From .
Statutory Instrument 2002 No.2665 .
The Electricity Safety . Quality & Continuity Regulations 2002 . ( Can you Confirm this is it change to 2006 ?? )

It States :-
Information to be provided on request
28 . A Distributor shall provide . in respect of any existing or proposed Consumer’s Installation which is connected or is to be connected to his network . to any person who can show a reasonable cause for requiring the Information . a Written Statement of -

(a) The maximum Prospective Short Circuit Current at the Supply Terminals .
(b) for Low Voltage connection . the Maximum Earth Loop Impedance of the Earth Fault path Outside the Installation .
(c) the Type & Rating of the Distributor’s Protective Device or Device’s nearest to the Supply Terminals .
(d) the Type of Earthing System applicable to the connection . &
(e) the Information Specified in Regulation 27(1)

Which apply . or will apply . to that Installation .
Under (d) above it is clearly the Responsibility of the DNO to tell you what Earthing System you should have .

As Regards the Earthing System your local Distributor is Legally Obliged to confirm the Type of Earthing Arrangement that you have Free-of-Charge . Quote Regulation (28) of the Electrical Safety . Quality & Continuity Regulations 2002 ( ESQCR2002 ) ….. HSE rules are Complex . Yeah .

They Must tell you or they are Breaking the Law . ??

Require the Fuse Drawing . ( in an Emergency of course one can Draw the Fuse although One should Not Replace it . of course Firemen do just this )


DNO do not want the User to be able to Isolate their Meter as this would allow People to Steal Power with More Ease . & with Smart Meter’s it would stop the DNO getting Information from the Meter . ?? ( This is my View only )

A Car must have a Brake but Nothing stops it from having Two . So use of “ a Means “ what a word can do . Yeah DNO !! Accordfire

433.3.1 . (iii)
At the Origin of an Installation where the Distributor provides an Overload Device & aggress that it Affords Protection to the part of the Installation between the Origin & The Maim Distribution point of the Installation where further Overload Protection is Provided .

thank you Amber .
 
Accordfire . Sorry about this you set me OFF in one “ Knowledge “ Old Amber . so my books are Out .

Fact of Fiction

The Supply Authority are duty bound On Enquiry to tell you what System you have . Although it Often takes some Persistence to get them to tell you as often they need to send someone Out to Test & of course that Cost them Money . ( Can you Confirm this Please )

From .
Statutory Instrument 2002 No.2665 .
The Electricity Safety . Quality & Continuity Regulations 2002 . ( Can you Confirm this is it change to 2006 ?? )

The DNO, you would imagine, should be under an obligation to know precisely HOW it supplies every customer it has. I seem to recall much noise being made when PME was introduced that it would be delivered to all properties in the UK by a given time, though I cannot recall now, where in the mists of time I got that. Either way, you would assume that it would be a relatively simple matter for a DNO to maintain records of connection type, without reverting to field inspection.

I don't believe the Q&CR 2002 has been superceded yet - it replaced the Electricity Supply Act of 1988 (as amended) - so I think the information you quote is still valid in all respects.

It States :-
Information to be provided on request
28 . A Distributor shall provide . in respect of any existing or proposed Consumer’s Installation which is connected or is to be connected to his network . to any person who can show a reasonable cause for requiring the Information . a Written Statement of -

(a) The maximum Prospective Short Circuit Current at the Supply Terminals .
(b) for Low Voltage connection . the Maximum Earth Loop Impedance of the Earth Fault path Outside the Installation .
(c) the Type & Rating of the Distributor’s Protective Device or Device’s nearest to the Supply Terminals .
(d) the Type of Earthing System applicable to the connection . &
(e) the Information Specified in Regulation 27(1)

Which apply . or will apply . to that Installation .
Under (d) above it is clearly the Responsibility of the DNO to tell you what Earthing System you should have .

As Regards the Earthing System your local Distributor is Legally Obliged to confirm the Type of Earthing Arrangement that you have Free-of-Charge . Quote Regulation (28) of the Electrical Safety . Quality & Continuity Regulations 2002 ( ESQCR2002 ) ….. HSE rules are Complex . Yeah .

They Must tell you or they are Breaking the Law . ??

This is certainly the basis on which the BS7671 forms state that certain figures can be ascertained "by enquiry" and IMHO, I believe the intent was to attach a copy of said written statement to the EIC forms where enquiry was used as the method of establishing the figures. Of course, it isn't done that way, in reality, and I cannot recall the last time I saw a written statement from a DNO confirming supply characteristics.

But yes, my read of the Act is the same as yours - they are legally obliged to provide this information free of charge to anyone with a reasonable interest - e.g. electrical contractor, property owner, and similar. Failure to provide such would, in simple terms, be breaching this Act, and as such, breaking a law.

Require the Fuse Drawing . ( in an Emergency of course one can Draw the Fuse although One should Not Replace it . of course Firemen do just this )

DNO do not want the User to be able to Isolate their Meter as this would allow People to Steal Power with More Ease . & with Smart Meter’s it would stop the DNO getting Information from the Meter . ?? ( This is my View only )

A Car must have a Brake but Nothing stops it from having Two . So use of “ a Means “ what a word can do . Yeah DNO !! Accordfire

Yes, the Fire Service has been known to pull the cut out fuse - though as you say, will rarely replace it (though many electricians subsequently will as the "seal" is no longer an issue)....and claim it was necessary for testing purposes. It does highlight that DNO's are selective with their rules - in other words you can pull and replace the cut out if and when it suits them, but not at other times - whatever your role.

When we install sub-mains from a primary incomer to say, an outbuilding, we often do so by means of a switch fuse at either end of the sub-main supply cable - this is deemed safe, and proper practice, and allows us freedom to work on the sub-main supply if needed. I fail to see how a primary main coming into a building is ANY different at all.

The installation of a second main switch on the tails between the meter and the CU would in no way bypass the meter, and in fact, would discourage ANYONE from tampering with the meter at all.

For those intent on stealing electricity - and we have, I daresay, all seen plenty of this, I don't think safety is, or has ever been, the primary concern, as so many times I've seen a bit of 6, 10, or 16mm T&E wedged into the supply tail terminals with the seal still fully intact.

That is a different case, and would happen irrespective of a second main switch fitted or not. Indeed, it may lead the less intelligent electricity thief to wedge his bit of twin and earth into the main switch thus NOT avoiding the meter.......the use of a switch in such a position, IMO would only serve to provide safe isolation between "repsonsibilities" - e.g. a clear and SAFE deliniation between what is the DNO's responsibility, and what is the property owner's. The current arrangement does NOT provide that at all.

433.3.1 . (iii)
At the Origin of an Installation where the Distributor provides an Overload Device & aggress that it Affords Protection to the part of the Installation between the Origin & The Maim Distribution point of the Installation where further Overload Protection is Provided .

thank you Amber .

Yes......two fuses. However, it makes the distinction between PROTECTION (of the supply) and SAFETY (for working on or around it).

Compare and contrast with a gas supply coming into a property......a shut off is provided, yet that allows easy access to the meter. Water, on the other hand, works exactly the way we're asking for - the meter is put out in the street, and a shut off (main stop cock) is provided inside or adjacent to the property.
 
Accordfire . May I take Opportunity to Thank You for your Time on this Matter . May I say you’re a Credit to this Forum . What ever your Getting Paid ask the Boss to Double it . Amber Big thank You .
 
This is One of the Reason(s) people post here is to make sure that they get it Right by Getting Views from People who have been there Before or are Qualified in Such Matter’s .

For Young Electricians’ in the Making
O.S.G. BS-7671:2008 . What was the Reason for the Seal ????

P/17 . 2.2.1. Distributor’s Cut-Out ( Fuse )
This will be Sealed to Prevent the Fuse being Withdrawn by Unauthorised Person’s .
 
I see option 2 is slowly gaining ground.....

"course arranged by dno or similar to prove competence".

I will be surprized if 'option 2' doesnt end-up being the winner of this poll, however, the words "free course" would have helped the votes along I reckon.


And, perhaps, whilst attending the "free course" some qualifications need to be shown ?


Laugh.


Ill vote for option 1 and 2 then.


O dear.
 
Last edited by a moderator:
Accordfire : Q/As

The Distance between the Meter – Service Fuse & the Joint is about 2M . ( is this a Hard & Fast Rule ) DNO
Does it really make any Difference . if the Earth & Neutral are Combined up to the Service Fuse . or up to a Joint . ???

DNO – the Neutral of the Source of Energy connected with Earth at One Point Only ( at or near as is Reasonably Practicable to the Source ) ??

My Nest Question .
For any reason that the ( TN-S ) is Damaged .
How easy is it for the Supply Authority to Change a ( TN-S ) to Convert ( TN-C-S ) DNO . Concentric Cable ? or can it be Done

TN-S . Distribution is no Longer Available in Quantity as it Use to be . Do you Concur . So the only Practical Solution when Systems are Getting Upgraded / Repaired . ( TN-C-S ) can we Say it’s here to Stay . ? or is TN-S getting a thing of the Past . ?

My only Drawback is . Often Records are lost . or Unable to tell Us !!

Thank you Sir . Amber
 
Amberleaf :

For Our Younger Forum Viewer’s . That’s in the Back ground .
Please use the forums members expertise . There Principals’ are Out standing to help Anybody . that need’s Help .

Sometime it must seam Mind-blowing Stuff . But we have to Start Somewhere . The Forum is here to help Anybody .

In a TN-S system both the Neutral & Protective Conductors are separate within the Supply & within the Installation . Normally the means of Earthing is provided from the Supply Cable Metallic Sheath or Other separate supply Conductor .

In a ● TN-C-S system the Neutral & Earth are Combined within the Supply & separate within the Installation . This means of Earthing is Provided from the Combined Protective & Neutral Conductor’s of the Supply ( i.e. PME Earthing Terminal ) Learning Curve .

In a TT system there is No Earth Terminal provided from the Supply & an Earth is Provided by Separate Earth Electrodes . normally Supplemented by One or More Residual Current Devices . ( RCD ↔ ADS ) 17TH Edition .
 
All The Cutouts we fit to houses whether they are new or just service renewals now come with the meter directly linked to the cutout and an isolator built into the meter!
So Give us a few years and it wont be a problem down south!
 
Here in scottishhydro land they operate a scheme where members of niceic or select can cut the seals and fit temporary numbered seals. U inform them of the address seal no etc and it gets resealed in future visit. Seems to work not too badly
The standard of there distribution networks is frankly shocking tho. Instead of spending on wind farms an solar pv plants they should spend a bit on their 80 year old cable heads with no earth etc.
Usually getting the response of we are under no obligation ti give u an earth etc
Try putting an earth rod in a 3rd floor flat u donuts!
 
Scottish and southern extremely helpfull issue tempory seals 10 at a time if you cant give addresses up front-helpfull on enquiries pme upgrades etc-they have not charged for one yet! Edf on the other hand are pretty much impossibe to even speak to the corrct department and totaly forbid removal-luckily most of my work is in sse area.One thing to note though sse recoment full protective gloves,mat and full eyeshield-the bakerlite can literally disintergrate in your hands-they showed me pictures when i called into local head office(£40 odds worth of ppe can really save your life)
It is a shame talks broke down with niceic and all scheme providers to get approval for removal accross all distribution companies
 
Just pull the fuse. Your life is paramount. It all comes down to “Safe Isolation”. I’ve had more than my fair share of bust ups with power companies,
Never lost yet!
They get down right snotty when you switch off the 33KV feed to a sub, I’ve done that twice now!
 
What surprises me is the number of houses without seals! Yes really, it makes me wonder how long they've been gone and why they haven't been resealed!
 
BS-7671:2008 . Younger Members

Scope . Object & Fundamental Principles .
120.1.
This Standard contains the rules for the Design & Erection of Electrical Installation so as to Provide for Safety & Proper Functioning for the Intended Use .

131. Fundamental Principles ( What the Regulations are here for . ) ◄ Yeah ,
Protection for Safety . Intended to provide for the Safety of Persons , Livestock & Property against Dangers’& Damage which may Arise in the
Reasonable use of Electrical Installation’s etc.

120.3 . Scope . Object & Fundamental Principles .
( Plain English )
The Resulting Degree Safety of the Installation shall be Not Less than Obtain by Compliance with the Regulation’s

Definitions : Competent Person . ( That’s what you are Aiming For ) ( Don’t Cut Corner’s ) &
A Person who Possesses Sufficient Technical Knowledge & Experience for the Nature of the Electrical Work Undertaken & is able at all Times to Prevent Danger . & where Appropriate . to Him/Herself & Other’s ………… ( Don’t Cut Corner’s )

▲ This Definition is Aligned with the Memorandum of Guidance on the ( Electricity & Work Regulation’s 1989 )

131.8. Scope . Object & Fundamental Principles .
Addition’s & Alteration’s to an Installation .
Your . Fundamental Principles . Before Work is Undertaken ( When will I use this One !!! Every Day in Life ) Start as you Mean to go ON . Yeah ( you are Professionals in the Making )

The Fundamental Regulatory Requirement’s . Yeah . it’s all in the Wording
 
“ Professionalism “ ( Younger Forum Member’s you are Carrying the High Standards of this Forum with You ) be Sean not Heard

If you are Required to Alter or Extend existing Circuits ,
However :- the Fundamental Principles Apply to Any Extension or Addition’s & Alteration’s to an Installation(s)
 

Reply to pulling the fuse in the Australia area at ElectriciansForums.net

Similar Threads

Hello, Is there an actual age limit on house wiring that would prevent a traditional fuse box being replaced with a consumer unit please...
Replies
8
Views
1K
Hi all, Been browsing these forums for a while, always great to learn a new way to skin the same cat. Anyway, cut a long story short, was an...
Replies
11
Views
778
This is an issue that is starting to get more of a ball ache for me, when theres a smart meter installed without an isolator and I really need to...
Replies
52
Views
19K
Bit of a rant first to explain the situation:- Effing builders again, I knew there was a reason we hardly ever work for them. We've done a few...
Replies
25
Views
1K
This is quite lengthy so get comfy... I had a bizarre call out relating to a job I attended about five years ago. The situation was they were...
Replies
11
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock