Looking at installing 2x double EV charger units in an underground car park each unit requires 64A supplies, the nearest fuseboard is roughly 120m away
What would be the best option, installing a local DB near the chargers and running 2x smaller SWA's to the units or installing 2x larger cables from the far DB. Would it also be wise to install a 3P DB local to the chargers and supply the chargers from different phases, looking at cable sizes it would require 35mm2 to supply each charger from the far DB. What size cable would be needed to feed a new DB next to the EV chargers? Would you calculate it from 128A or 64A and put each charger on a different phase?
What would be the best option, installing a local DB near the chargers and running 2x smaller SWA's to the units or installing 2x larger cables from the far DB. Would it also be wise to install a 3P DB local to the chargers and supply the chargers from different phases, looking at cable sizes it would require 35mm2 to supply each charger from the far DB. What size cable would be needed to feed a new DB next to the EV chargers? Would you calculate it from 128A or 64A and put each charger on a different phase?