Hello, I just had my house reqwired by a local company, which did include an actual electrician. They said they would give me the Part P etc. paperwork after I paid for it, which I have. but, it was a couple of months ago now, and they always give excuses about being too busy, out fo the office, man down this week, and so on. I'm beginning to think I'm not ever going to get it.
From my point of view, without the paperwork it didn[t happen and I've got big problems when it comes to selling the house eventually. Is there another way I can get over this problem, e.g. by getting another electrician in to inspect the system and sign it off, or something else to get the work regularised?
From my point of view, without the paperwork it didn[t happen and I've got big problems when it comes to selling the house eventually. Is there another way I can get over this problem, e.g. by getting another electrician in to inspect the system and sign it off, or something else to get the work regularised?