afternoon guys
how would you go about 1st fixing this...
would the builder usually batten/stud out- then board- or will they be wanting to board straight onto the walls??

only meet the client so far (not builder)

IMG_0322.JPG


IMG_0323.JPG


IMG_0324.JPG
 
tell me that's not somebody's idea of a tree house.
 
  • Like
Reactions: DPG and Specialist
  • Agree
Reactions: 1 person
Tackers will board straight on to the wooden structure, its up to you to work out/design cable sizes and runs etc. Are you an electrician ? Domestic is the most basic electrical work there is.
 
They normally put kingspan between the timbers and then board over. I'd speak to the builder and work with him to get conduits in place with cables installed.
 
  • Agree
Reactions: Rpa07
Tackers will board straight on to the wooden structure, its up to you to work out/design cable sizes and runs etc. Are you an electrician ? Domestic is the most basic electrical work there is.
Yes it's not all straight forward
 
not done a new build as yet- hence my question thanks for telling me my jobs....whats yours?

HUM.... if you had included the fact that you only visited for the first time yesterday then you may have got better responses....

Last one I looked at like this, the builder expected the 1st fix to be done over a weekend so as not to hold up his schedule .... needless to say I declined to get involved...
 
They normally put kingspan between the timbers and then board over. I'd speak to the builder and work with him to get conduits in place with cables installed.
In all honesty I would have expected to see most of the wiring already installed prior to the insulation going in, it's going to be a right Pig of a job now, when you quote for this install you will need to take the issue of removing, (Where necessary any insulation) best to let the Builder and Client aware of this, It will add considerable time and costs to the job. Both Builder and Client have jumped the gun on this particular project, it's not only electrical work, there will be plumbing and heating works as well, the Project Manager (if there was/is one) want's a stiff talking too.
 
@J.C.E Thing is mate, the client should have got you involved long before this. If you'd been called in at the start you & the builder could have worked the job between you. Now they've put you on the back foot playing catch up, your first thing has to be a meeting with the builder.
Hopefully he'll be one of the tidy builders & work with, rather than against you.
It's to his advantage to get the 1st fix Electrics & Plumbing in, so he can progress the job. Good luck.
 
  • Like
Reactions: J.C.E
@J.C.E Thing is mate, the client should have got you involved long before this. If you'd been called in at the start you & the builder could have worked the job between you. Now they've put you on the back foot playing catch up, your first thing has to be a meeting with the builder.
Hopefully he'll be one of the tidy builders & work with, rather than against you.
It's to his advantage to get the 1st fix Electrics & Plumbing in, so he can progress the job. Good luck.
all as I though tbh- just the same as elec 1stfix would be done prior to any celotex or rockwool.
but wern't sure if in these new builds they batten out- sort of like they do in a tanked basement- so to give you space to wire. but oviously not!
 
I'm out not getting involved in a childish mud slinging contest.:mad:
 
Hi J.C.E: No mate once insulation is in, it's normally straight over boarding.

As for your 1st New build, don't worry about it buddy we've all been there & at some time all asked for advice. That's what the forum is here for.
The only dumb question is the one you didn't ask but know you should have.
 
Last edited by a moderator:
afternoon guys
how would you go about 1st fixing this...
would the builder usually batten/stud out- then board- or will they be wanting to board straight onto the walls??

only meet the client so far (not builder)

View attachment 36570

View attachment 36571

View attachment 36572
It's a shame that people can't just reply with a helpful idea, rather than using derogatory insults as after all it's an electricians forum used to discuss electrical issues.
Hope you get sorted with the build :)
 
just wait for the woodworms to do their work and you'll have ready made holes for your cables. wood houses. YUK.
 
Thread tidied up. @Anthony S if you can't contribute civilly they don't bother. Your manner of posting was looking to provoke a reaction. And instead of others reacting hit the report button and it'll be dealt with. Now can we please keep the thread on track, as I'm busy watching Mrs leesparkykent pack the suit cases ready for tomorrow :D
 
Last edited by a moderator:

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

J.C.E

Arms
~
Joined
Location
Earth

Thread Information

Title
new build 1st fixing with insulation!
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
39

Advert

Thread statistics

Created
J.C.E,
Last reply from
john davies,
Replies
39
Views
4,462

Advert