With ammendment 3 upon us, there are a lot of plastic cu's still out there.
Basically these can still be fitted up to the implementation date of 1st Jan 2016 regarding steel or non cumbustable enclosures.
So on the new AMD 3 certs that you now have to use, along with a plastic c/u.
How are you commenting on regulation 421.1.201 with reference to its implementation date ie 1/1/16.
Are you doing so within the departures section, seeing as you are filling AMD 3 certs now.
Or indeed, are you mentioning it at all, ?? seeing as your install is dated before 1/1/16.
Be very interested in how others are dealing with this.
I dunno all these changes to regs seem to be getting more and more frequent lads.
You pay a fortune on books and certificate formats and then WHAM it all changes (Yet again) and that's another cash cow your pulling out on, and even more cover your back scenarios to deal with.
Sorry I digress with a rant. lol.
 
Last edited by a moderator:
As its a specific regulation with a delay on it then in respect of cert's it doesn't need addressing until 1/1/16 so no need to mention it. IMHO
 
i agree with blackadder, sorry, darkwood.
 
If your concerned about future sparks reviewing your cert' you could always put a comment in regarding the specific regulation 421.1.201 does not take effect until 1/1/16 and has been excluded from the design/inspection/cert etc'. As its not a departure as such because the regulation isn't in force yet then it doesn't rightly belong in the section of the same heading - but it won't hurt anyone to put it in there for clarity of the exclusion of the regulation.
 
Maybe we should state that the installation doesn't comply with the 18th edition in the departures because the implementation date is yet to be clarified.
Really cover our bottoms lol
Just kidding lads
 
On the other hand, the full statement reads as below. So Implementation date for the reg is Jan 1st, but you should still comply with it prior to that date ????
Now that makes things nice and clear.
To comply or not to comply, its a departure, or not a departure.
Now is it me or do these guys enjoy producing statements that are as clear as mud.
Before that date you can, but you shouldn't ???????

NOTE 2: The implementation date for this regulation is the 1st January 2016, but does not preclude compliance with the regulation prior to that date.


 
I'll still fit plastic for the first few months of 2016, well, I designed it on the 31/12/2015 cough cough :wink:

All jokes aside, this is a nonsense reg which most of us dont agree with. A simple design change could have better results eg:-

i) All Neutral bar terminations should have 2 terminal screws.

ii) The Neutral bar should be further away from the plastic enclosure (eg no less than 10mm) or...

iii) Neutral conductors in the CU should not touch or be close to any material prone to melting or catching fire (bring back Bakelite as a neutral bar internal enclosure)

iv) Incoming Tails should have a cable clamp before entry to the Iso switch. (just like the new design metal CU's in case it is a TT system). OR

v) The CU's Iso switch incoming terminations is a lever & spring clamp system just like a Wago. 25mm Tails will never become lose!!!


Or they can keep all of the same terminations as they are and just insist on a metal box that wont melt/catch on fire. IMHO the problem has not been address, only a quick knee jerk reaction to reduce the spread of fire due to poorly installed CU's and limp wrist-ed electricians. The terminations are the problem, not the box that they sit in.
 
On the other hand, the full statement reads as below. So Implementation date for the reg is Jan 1st, but you should still comply with it prior to that date ????

No, what it states is that it is permitted to install non-combustible distribution boards before that date. (Why they felt the need to state this is beyond me!) It does not state that you "should" do it - simply that you may.

The bigger issue is deciding whether it is sensible to install an item which we know will be prohibited in under six months time.
 
Last edited:
My local wholesaler is not replacing stocks of plastic...and they are struggling to get stocks of metal ones! Even see that Screwfix are selling the standard dual RCD CU's at about £90, when they used to be £60.
 
No, what it states is that it is permitted to install non-combustible distribution boards before that date. (Why they felt the need to state this is beyond me!) It does not state that you "should" do it - simply that you may.

The bigger issue is deciding whether it is sensible to install an item which we know will be prohibited in under six months time.

Appreciate your interpretation (and I agree with it) but that's deffo not what it states.
What it states, word for word is,

NOTE 2: The implementation date for this regulation is the 1st January 2016, but does not preclude compliance with the regulation prior to that date.

And that's the problem, ask different people how they would interpret, and like you they will come up with there version.
Not your fault or anyone else's but I take issue with a statement that's based on regulations that's unclear and appears to contradict itself.
Mind you if they did phrase it the way you have, it would be a lot clearer to anyone reading it.
Whole ruddy Idea is a half thought out shambles, that fails to address the real problem any way.
 
Last edited by a moderator:

Reply to Still fitting plastic ?? in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

Similar Threads

NICEIC Certification Scheme Getting accredited to
Looking for some advice regarding joining a CPS. I've been in the electrical industry in various roles for nearly 10 years. I started my...
Replies
15
Views
1K
Hi everyone Ive just had an electrical condition report conducted on a mixed-use property, and I am extremely surprised that after the last report...
Replies
11
Views
2K
Hi, need some advice, I moved over from Sse in 2020 to Octpus energy. Whilst I was with SSE I was on E10 when I went over to octopus they put me...
Replies
1
Views
474
Hi all Recently we've been having a few issues with smoke and heat detectors.. been fitting them for years and years now mostly without any...
Replies
14
Views
2K
D
Hello everyone, thanks for this nice forum! I'm looking for some raw logs of RS485/Modbus communications between an inverter and its smart meter...
Replies
0
Views
1K
Deleted member 147397
D

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock