- Reaction score
- 520
No schedule in distribution boards what code would you give this previous reports state code 3 I was thinking code 2 but a bit unsure factory environmental
Discuss What code would you give for the following in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net
You're absolutely right - it can't possibly be satisfactory when you have no idea where it is going or whether it is safe!they've given it as a satisfactory in most boards there's still unidentified circuits so can't understand how it can be given a satisfactory report
I like that one Murdoch.Not C2 ...... FI which can also give unsatisfactory
Previous reports state C3 ... yet nothing has changed ....
Are place got a c1 for no schedule , c1 for using SY c1 for missing RCD testing sticker c1 for no bonding to water mains (when Ch is bonded and incoming is plastic ) he was from the insurance and tried to c1 everything . Don't think he could count past 1
just have to make do robbing dust caps now Tel .mickfred is in Liverpool.the guy who gave all them C1's needs to get income from remedials, as his previous job has become rdundantdue to the ever increasing use of security locking wheel nuts. ,
Reply to What code would you give for the following in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.