marshr02

Opinions needed...past the halfway mark in a major house refurb. (for info: am qualified electrician - although it's not the day job - Part P handled via Building Control). Top half of house is still a building site, lower half of house is sort of okay, but rough round the edges. Rang up EDF to arrange temp disc of power, followed by reconnection later in day - to change CU over. Have a EIC to provide (labelled 'dead tests only') Suddenly thought that when bloke comes there will be clearly 1st fix cabling visible to upper storey. The intention is to 'add' these circuits in good time - well after the CU has been changed and EDF long gone (with proper testing). My question is first thing on the day concerned EDF could not only indicate they won't connect later on, but actually not allow me to back out of the disconnect. Hope that all makes sense....seal fairies not an option...
 
EDF will basically turn up and remove the fuse, then put it back in later.

That's it.

They couldn't care less what's going on inside your property, that's all down to building control.
 
  • Like
Reactions: 2 people
I though they had a duty not to connect up to an unsafe installation - and are increasingly after EIC or Condition Reports before reconnecting to cover themselves?
 
Perhaps what going on is they have to be seen formally to quote the documentation etc, but in real life they just do as you say....unless they turn up at a house with cables dangling down from the upper stories (my house :)
 
I though they had a duty not to connect up to an unsafe installation - and are increasingly after EIC or Condition Reports before reconnecting to cover themselves?

What they are "supposed" to do and what they "do" are two entirely different things. I have NEVER been asked to show them anything.
 
  • Like
Reactions: 1 person
Thanks for reply. When they turn up, do they have a good nose around - or just head straight to the cut out?
 
In, to cut out, pull fuse, if you are ready to swap cables good, if not will come back later. Gone.
(Fit an isolator)
 
  • Like
Reactions: 2 people
In, to cut out, pull fuse, if you are ready to swap cables good, if not will come back later. Gone.
(Fit an isolator)
Okay - thanks everyone - you've put my mind at rest. Don't think the other half plus 6 month old would have been happy with no power for days on end.... :)
 
What they are "supposed" to do and what they "do" are two entirely different things. I have NEVER been asked to show them anything.

Reminds me of the old Thomson holidays ad. "If we don't do it, don't do it. But if we do, do.

What an extinct bird like the dodo has to do with holidays I could never figure out.
 
  • Like
Reactions: 2 people
Thanks for reply. When they turn up, do they have a good nose around - or just head straight to the cut out?

Well the last time I needed to involve them, I had all the paperwork ready for them, but I made sure not to offer it to them. I chose instead to wait until they asked to see it, but they never did. ALL they were interested in was their fuse and the seals. That was it !!!

So, don't worry yourself !! :)
 
  • Like
Reactions: 1 person
As RB says, then you can isolate it whenever you want without involving the 'seal fairies'

Yes, already have the Wylex REC isolator ready. I was hoping if I talked nicely they would just hang around while I changed the tails over to the isolator - then I don't need a return visit, and can do things without one eye on the clock...
 
Hi marshr02,

been in similar situation, not self certifying yet or meter plus having to clear CU changes via labc, i had new isolator switch mounted in supply cupboard when DNO turned up, said he was only there to pull fuse, i said it was booked to fit isloator thats why i had it ready for him,

his answer "saves me coming back later" and promptly connected into new isolator.

I have never been asked for any paperwork but was once asked why the tails now had to be 25mm
 
Thanks people. For the record, bloke turned up, and was easy to sweet talk him into staying for 20 mins while I swapped over old/new tails. He asked for the EIC, and I barely waved it under his nose, and he was fine. No forms to fill in, or paperwork to submit. Easy.
 
I would find it very unusual for the fuse puller and sealer or a meter installer to ask for any paperwork because they simply would not understand it. In the old days of the Electricity boards these Guys would have been fully qualified Electricians/Engineers, these days they have been on a 1 week training course on how to work safe on their systems and are not electricians or engineers. This is not to say there are not some out there for some of the companies, but the majority are not.
 
  • Like
Reactions: 1 person
OutS, your signature is seriously wrong, water came first, then light, wouldn't that make plumbers higher Gods?!?!

Genesis 1

New International Version (NIV)

The Beginning

1 In the beginning God created the heavens and the earth. [SUP]2 [/SUP]Now the earth was formless and empty, darkness was over the surface of the deep, and the Spirit of God was hovering over the waters.

[SUP]3 [/SUP]And God said, “Let there be light,” and there was light. [SUP]4 [/SUP]God saw that the light was good, and he separated the light from the darkness. [SUP]5 [/SUP]God called the light “day,” and the darkness he called “night.” And there was evening, and there was morning—the first day.
 
"[SUP]12[/SUP]And on the sixth day the rain came and covered the earth, for God had left His bath running while answering the phone, and the Plumber couldn't be bothered to fit an overflow as the day was Friday and he had to leave early to pray to the false god 'Lager'. [SUP]13[/SUP]From that day hence, the Plumber was to be known as 'Satan'..."
 
Last edited by a moderator:
  • Like
Reactions: 4 people

Similar threads

T
Replies
11
Views
2K
Australia
Engineer54
E

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

YOUR Unread Posts

Daily, weekly or monthly email

Thread Information

Title
Am I at risk of disconnection?
Prefix
N/A
Forum
Electrical Wiring, Theories and Regulations
Start date
Last reply date
Replies
16

Thread Tags

Advert

Thread statistics

Created
marshr02,
Last reply from
Stroppy,
Replies
16
Views
1,984

Advert