Hi all,
I've been asked to correct a few of the issues brought up by a recent PIR (the original contractor now has too much work on).
The building is fairly modern and the electrics not too old, the question I need to ask is:
One of the Code 2's that was brought up is - 3 gang switch fed by 3 separate circuits, can I pass this if i label the switch with a "multiple circuits" label or something of the sort?
(note 3 phase supply to the building & may have to label 415v if separate phases also.)
Cheers,
Dan.:mickey:
I've been asked to correct a few of the issues brought up by a recent PIR (the original contractor now has too much work on).
The building is fairly modern and the electrics not too old, the question I need to ask is:
One of the Code 2's that was brought up is - 3 gang switch fed by 3 separate circuits, can I pass this if i label the switch with a "multiple circuits" label or something of the sort?
(note 3 phase supply to the building & may have to label 415v if separate phases also.)
Cheers,
Dan.:mickey: