Hi every1,after doin all the hard work,ie connectin 4x300mm swa cabling and installing from a 1600 amp main switch,then connecting 2 a square d panelboard,400mm swa single cabling, eon the supplier refused 2 connect the tails.The consultant worked out that we needed 3x400mm swa tails,per phase,2 neutrals & 2 400mm earths.These cables cud not physically b connected onto eon switchgear ,& so no connection happened.They refused 2 piggy back any connection,they now require us 2 run 2x630mm tails per phase,2 neutrals & a earth,this will b very expensive & time consumin,But what a cock up by the consultant,how 2 fit a round pin in2 a square hole take ii easy,ta ra bab,cheers 4 all replies & help