S
solarsparkie
please contact me for details , scaffold already up cable from roof to consumer unit already present tel 01202 280382
Mark
Mark
Discuss install sign off required poole dorset x 2 10 panels prior to 14th sept 2014 in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net
Are the panels installed and whats happening on the 14th Sept
Are you actually wanting someone to sign off a system under MCS where the contract isn't with them ??
See MCS 001 Appendix A Clause 8
"A contract for the sale and installation of a system shall be entered into only between an MCS certified Company, which is certified for the technology type (s) in the contract, and a Customer."
Or were you hoping to get it done on the cheap... where have you been for the last 2 years!
Reply to install sign off required poole dorset x 2 10 panels prior to 14th sept 2014 in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.