Does anyone on here have experience or currently do any work for large house builders?

What kind of prices do they offer for new build work?

Me and my mate just smashed out three 3 bed houses in a week. And no it wasn’t a rough job, we are just fast workers and know how to get it done well (not blowing are own horns)

I’m sure I spoke to someone a while back to who said they get a day for pair to 1st fix and a day for a pair 2nd fix a 2/3 bed house....
 

Pete999

Mentor
Electrician's Arms
Messages
22,989
Location
Northampton
Does anyone on here have experience or currently do any work for large house builders?

What kind of prices do they offer for new build work?

Me and my mate just smashed out three 3 bed houses in a week. And no it wasn’t a rough job, we are just fast workers and know how to get it done well (not blowing are own horns)

I’m sure I spoke to someone a while back to who said they get a day for pair to 1st fix and a day for a pair 2nd fix a 2/3 bed house....
Not possible if that incudes testing and certification, unless you are working 24/7
 
OP
T

TJC1

Regular EF Member
Messages
101
Location
United Kingdom
Does anyone on here have experience or currently do any work for large house builders?

What kind of prices do they offer for new build work?

Me and my mate just smashed out three 3 bed houses in a week. And no it wasn’t a rough job, we are just fast workers and know how to get it done well (not blowing are own horns)

I’m sure I spoke to someone a while back to who said they get a day for pair to 1st fix and a day for a pair 2nd fix a 2/3 bed house....
1st fix that is.......
 

Pete999

Mentor
Electrician's Arms
Messages
22,989
Location
Northampton
I know a builder that's absolutely huge. Full breakfast every morning with 3 eggs. Drinks beer like its going out of fashion.
Think the OP means "large building firms" not how much heart attack food they get though lol
 

Dustydazzler

Regular EF Member
Messages
1,244
Location
Surrey
Without getting drawn in to ‘how quick can you lash out a new build’...
1st fix basic spec house.
On your own you could probably chop all the boxes in one day and start drilling out joists. Day two finishing drilling the joist holes then start pulling cables. Day three full on cable pulling day. Day four finish off wiring and do all your capping and tidy up any odd bits.
Day five if necessary

?
 
Last edited:

Grant1987

EF Member
Messages
19
Location
Aberaman
would like to see some pics.......
Probably getting ripped off and have to “smash” the work out cos the LARGE builder is milking them and telling them fixed price per property which is poor rate sad to see we are meant to be cream of the crop and not let builders take advantage I’ve learnt from my mistakes in the past as I’m sure we all have
 
  • Like
Reactions: DPG

GMES

Admin
Staff member
Admin
Messages
9,209
Location
Under the banana tree.
As Lee said, there are easier ways to make money.
I'm not saying that you're making it up but that sounds unrealistic unless like someone said, we aren't getting the full pictures.
 

cliffed

Regular EF Member
Messages
1,239
Location
Lancs
Without getting drawn in to ‘how quick can you lash out a new build’...
1st fix basic spec house.
On your own you could probably chop all the boxes in one day and start drilling out joists. Day two finishing drilling the joist holes then start pulling cables. Day three full on cable pulling day. Day four finish off wiring and do all your capping and tidy up any odd bits.
Day five if necessary

?
Totally agree,same procedure I had,many years ago.
 

anthonybragg

Electrician's Arms
Messages
4,452
Location
NORTHAMPTON
Without getting drawn in to ‘how quick can you lash out a new build’...
1st fix basic spec house.
On your own you could probably chop all the boxes in one day and start drilling out joists. Day two finishing drilling the joist holes then start pulling cables. Day three full on cable pulling day. Day four finish off wiring and do all your capping and tidy up any odd bits.
Day five if necessary

?
No chopping in boxes as dot and dad so 25mm boxes are used only ones to be chopped in are 35 & 47mm for the grid, cooker and shaver sockets.
All the large housebuilders use I beams with the webbing or have the knock out holes if need drilling they are only thin ply type wood.
 

Dustydazzler

Regular EF Member
Messages
1,244
Location
Surrey
Most new builds these days are fast fix boxes , fine for switches but after a few months of pulling plug tops in / out from 13a sockets they start to break the plaster around the wings.
Then looks dog rough
 

Gavin John Hyde

Electrician's Arms
Messages
2,690
Location
Somerset
I was helping out a friend back end of last year to get some new builds done before christmas on a labour only basis. Only 8 houses.
He had previously worked for a large contractor who do a lot of the new build developments around here before going solo.
They typically would first fix a standard 3 bed house in 4 days. Second fix and testing for certification taking another 2 or 3 depending on spec.
They didnt see point in rushing normally because they were usually on a price per house rate depending on size, and there was always a week allocated for the electricians in the schedule, so they could take upto 5 days for first fix before the other trades got held up. they had another 3 or 4 allocated for the 2nd fix. So always had capacity for slight over runs
With some builders they plan out the job poorly and things are always being moved around. it often shows in the final finish of things like skirting and decoration within the property as the customer doesnt see the wiring.
 

Dave OCD

Mentor
Electrician's Arms
Trainee Access
Messages
3,212
Location
Cornwall
Most new builds these days are fast fix boxes , fine for switches but after a few months of pulling plug tops in / out from 13a sockets they start to break the plaster around the wings.
Then looks dog rough
I've never ever had any problems like that with dry lining boxes, always use Appleby, maybe the different lug design helps avoid such issues ?
 

Leesparkykent

Super Moderator
Staff member
Super Moderator
Moderator
Mentor
Electrician's Arms
Trainee Access
Messages
9,613
Location
Kent
Im yet to see a new build with skim . All seem to get tape and filled . Plus its nice to be able to remove the dry liner after plastering .
Charles church the ones who do retirement, warden assisted, new build flats have them skimmed.
 

Permanent unswitched live colour?

  • Brown

    Votes: 59 66.3%
  • Black

    Votes: 30 33.7%

Electrician Talk

Electrical Forum

Welcome to the Electrical Forum at ElectriciansForums.net. The friendliest electrical forum online. General electrical questions and answers can be found in the electrical forum.
Top