Can anyone tell me if you still require main earth bond to the incoming mains water. All the pipework and central heating is plastic (except 1m of copper from combi on water and central heating). The boiler is about 5m away from incomming mains. Also the mains is a minimum of 5m of plastic MDPE to stop cock?
If this is required where do you clamp as it is all plastic except for a small bit under boiler.?:confused:
 
If the majority of the pipe work is plastic there is no need to bond , the bond to services water etc is to protect the installation from outside the property hence the reason why its bonded at the point of entry so as its plastic no need for a bond
 
  • Like
Reactions: 1 person

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
Main earth bonding on plastic water mains and pipe?
Prefix
N/A
Forum
Australia
Start date
Last reply date
Replies
1
Unsolved
--

Advert

Thread statistics

Created
Rayelect,
Last reply from
nickblake,
Replies
1
Views
4,859

Advert