And wiring some circuits for sockets cabinet lighting etc, it will be on your head if you continue trying to jury rig the existing, bite the bullet and tell them what they need to know, not what they don't want to hear.No code.
You need to get used to delivering information that people don't always want to hear.
Its only 4 circuits so I would be talking to the client about changing to a RCBO board ....
Botch?Change the Consumers Unit to provide more ways for new circuits then. Scare the customer? your job will be to provide the safest installation possible, not a botch just because the CU isn't big enough.
By the time they spent money on an EICR, they'd have a CU installed.[/QUOTE
Its all ideal world stuff though. I agree with everything, apart from the botch comment which was made, but ultimately if after ive done the EICR and made recommendations such as a new consumer unit or wiring a new ring and the customer doesnt want to go ahead with such work what do i do? Surely not walk away from a job where i can still comply to current regs.?If it were my job, I would persude them to have a new RCBO CU, new radial or RFC for kitchen, and new lighting circuit for kitchen as well.
Then they have RFC for rest of house, and two lighting circuits. Just my opinion.
Really? How much do you charge respectively for such work?By the time they spent money on an EICR, they'd have a CU installed.
Really? How much do you charge respectively for such work?
OK I'll rephrase, what you are intending to do is hardly ideal for a major refurbishment, ask yourself how you would integrate the existing socket circuit in to the existing RFC, when a new kitchen ring or Radial would be more appropriate, perhaps "botch" was a bit harsh, "inapropriateBotch?
Its all ideal world stuff though. I agree with everything, apart from the botch comment which was made, but ultimately if after ive done the EICR and made recommendations such as a new consumer unit or wiring a new ring and the customer doesnt want to go ahead with such work what do i do? Surely not walk away from a job where i can still comply to current regs.?
I appreciate that dont get me wrong. As stated i agree with everything thats being said but as electricians weve all come across situations where doing the ideal job isnt always practical for a number of reasons. So what then?As I said, I don't do EICR's, but I've seen suggestions of around £200 for such like (EICR's)
It's your job & client, so only you know the booby more with that. Just suggesting a alternative viewpoint.
It appears to be present, did a quick visual check and will check continuity properly when the EICR is carried out.How far away from the kitchen is the existing consumer unit? Is the earthing and bonding up to scratch?
I ap
I appreciate that dont get me wrong. As stated i agree with everything thats being said but as electricians weve all come across situations where doing the ideal job isnt always practical for a number of reasons. So what then?
Reply to EICR and subsequent remedial work in the UK Electrical Forum area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.