Just wanted to check what others understanding / experiences are with extending an existing system: Customer has a 3kW system on the old 43p and wants to add another 4kW to it (DNO all sorted). Am I correct in saying that the existing system stays on the original 43p tariff and the extended part gets todays 4kW tariff (14.9) or does the extended 4kW get the 4-10kW tariff because the installation exceeds 4kW in total?
Thanks.