Had the plumber in today and have come across a problem with my stopcock. It basically won't close, stays open so he was going to replace it. As it's in a very awkward place he suggested repositioning it to a better place that's more accessible, ie underneath the sink. Now there's a 10mm earth on the consumer side which is fine but if this stopcock is to be done away with & repositioned, will the 10mm earth need to also be repositioned so it's on the consumer side of the new stopcock or is it fine to leave it where it is?
 
if the stopcock is otherwise OK, apart from not closing, why not leave it in and fit a second one after it? sounds a much simpler job and the bonding can stay as is.
 
Do they intend to use plastic pipework or plastic stopcock or will it all be copper and brass? If plastic you may need to reassess what items in the bathrooms require bonding.

Where's Cockburn when you need him? ;)
 
Had the plumber in today and have come across a problem with my stopcock. It basically won't close, stays open so he was going to replace it. As it's in a very awkward place he suggested repositioning it to a better place that's more accessible, ie underneath the sink. Now there's a 10mm earth on the consumer side which is fine but if this stopcock is to be done away with & repositioned, will the 10mm earth need to also be repositioned so it's on the consumer side of the new stopcock or is it fine to leave it where it is?

So this seized open stopcock is going to be abandoned and a new one fitted a bit further downstream??

There's nothing wrong with that and I've done it myself. Why not just leave your bond where it is and if anybody wants to argue the ---- tell them that one is the main stopcock and the one under the sink is a secondary one.
 
So this seized open stopcock is going to be abandoned and a new one fitted a bit further downstream??

There's nothing wrong with that and I've done it myself. Why not just leave your bond where it is and if anybody wants to argue the ---- tell them that one is the main stopcock and the one under the sink is a secondary one.

Original is that G
 

Reply to Reposition water service earth bond. in the Electricians' Talk area at ElectriciansForums.net

Similar Threads

Greetings, I am homeowner and looking to confirm if I will need earth boding to water pipes. There is already earth boding near Gas meter and the...
Replies
23
Views
896
Please can someone explain if this is a TNCS or a TNS earthing arrangement because it looks like both to me. Old undersized main bonding conductor...
Replies
5
Views
3K
I'm practising EICRs on friendly locations as I'm still in training - technically done my 2391-52 but frankly need loads more practise. I've just...
Replies
11
Views
916
I'm in a questions asking mood tonight. I briefely looked at a job today and I need to recommend a board change but need to justify it. Firstly...
Replies
7
Views
1K
Did a eicr on a upstairs flat, there is 1 main bonding cable from the consumer unit, the gas pipe comes from the gas meter outside and up the wall...
Replies
21
Views
3K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock