- Reaction score
- 8,293
Got a phone call at 6.20 this morning from one of my regular good customers, Can you pop up and take a look at the electrics.
Something as tripped due to a leak in the roof, So off i go to find Puddles of water all the way through the factory 2 sub boards tripped out leading to half the the high bay lights out, 2 compressor's off all 240v sockets Plus about 20 other circuits!!
Me and Darrel have had to get a new sub main installed new 3phase Schneider board just to get the compressors back on after rerouting to 2 supplies for them dragged back and into the new DB.
Monday and Tuesday is now going to consist of replacing the 2nd damaged 3 phase board and testing of all circuits before we can even begin to start energizing circuits.
On a good note though Darrel did get to play with his 1st lot of 50mm x 4 core swa.
Nothing like a steady Saturday morning
Something as tripped due to a leak in the roof, So off i go to find Puddles of water all the way through the factory 2 sub boards tripped out leading to half the the high bay lights out, 2 compressor's off all 240v sockets Plus about 20 other circuits!!
Me and Darrel have had to get a new sub main installed new 3phase Schneider board just to get the compressors back on after rerouting to 2 supplies for them dragged back and into the new DB.
Monday and Tuesday is now going to consist of replacing the 2nd damaged 3 phase board and testing of all circuits before we can even begin to start energizing circuits.
On a good note though Darrel did get to play with his 1st lot of 50mm x 4 core swa.
Nothing like a steady Saturday morning