R

R4BOE

hi

this installation was carried out in the 1995 ish

advice please on what code should be issused for a server room and also floor sockets (althought server room and floor room are on sepearate circuits) wired in 2.5 / 1.5 TW&E as radials with no high integrity earth i.e only one earth conductor.

the floor socket circuits have about twelve pc pluged in !


and also there is wall sockets with ring circuits with PC's pluged in with no double earth terminals on the socket outlets.


any advice welcome
 
You first need to check the total earth leakage current on each of these circuits, they may need a separate suitably sized earth conductor to be run in. Not having the appropriate data in front of me, i'll leave to others, the parameters you need to be working too!!
 
thanks E54
anyone else with to help me out with more in fo on the observation code

I'm sure someone posted a guidance note on ''High Integrity'' earthing requirements not so long ago. Check the similar threads at the bottom of this page, One of those threads may have that link, or can help you via the posts....
 
Last edited by a moderator:
Gemini Fire Management are specialist suppliers of fire Gas suppression systems and water leak detection systems for high value risk areas. Gas suppression system clients include major banks and IT companies.

[TABLE="width: 167"]
[TR]
[TD="class: xl65, width: 167"]Room integrity testing
[/TD]
[/TR]
[/TABLE]

I'm a little confused here, ...What has ''Room Integrity'' got to do with high integraty earthing?? This is to do with room sealing for gas supression systems...

More spam crap is it???
 

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
lack of high intergrity earthing on computer socket radials
Prefix
N/A
Forum
Periodic Inspection Reporting & Certification
Start date
Last reply date
Replies
5

Advert

Thread statistics

Created
R4BOE,
Last reply from
Engineer54,
Replies
5
Views
3,269

Advert