Hi,

New to the forum, but an experienced electrical DYIer. Decades of work on cars, also, house electrics, model railroad automation and arduino monitoring.

My reason for joining though, is really to get some advice regarding a quote I have received to get a property EICR compliant. The property is a '70s, smallish three bedroom semi-detached house with a garage.

I have been quoted a staggering £2140 for what appears to be relatively straight forward work.

- Supply and fit 10 way consumer unit with RCBOs
- Drill out back of kitchen unit to reveal water earth bond
- Change sleeving on immersion heater spur
- Change cable to immersion heater
- Fit screw to immersion heater cap
- Supply and fit 20 fire rated downlights
- Correctly terminate wiring for downlights
- Supply and fit rubber grommets to all back boxes
- Fit stuffing glands to garage sockets
- Remove rewirable fuseboard in garage and replace with fused spur
- Replace wiring between garage switches
- Replace non-working immersion heater boost switch
- Remove ceiling fan bracket and fit pendant cover in front bedroom
- Supply 5 year Electrical Installation Certificate

Most of these I could do in a day myself. If I add up items needed, consumer unit, RCBOs, downlighters, maybe I can see £400-450 in that. That leaves £1700 for the actual work to carry out. Even at £250/day, that's 7 days work.

Am I missing something obviously expensive in that list?

"Drill out back of kitchen unit to reveal water earth bond" - Is that just for inspection?
"Correctly terminate wiring for downlights" - what is actually needed here?

Hope for some guidance here.

Thanks
 
I think the mats would be more in the order of £800 plus a mark up, say £1000. Sounds like about 3 days work. £300 per day plus a labourer @ £120 a day. Don't forget time for issuing/making up certificate and testing on all circuits. Would have to issue an EIC and an EICR lets say about four hours in all, that's half a day. As well if you did the work you would have to pay BC £350, which you save because I am doing it as a registered installer. So my price would be higher if you do the figures. i.e. £2410
 
I doubt you’d get all the materials needed for less than £800-£900 mate let alone £450, that would cover the full rcbo unit and fitting and test, 20 decent downlights supplied and fitted is gonna set you back about £500-£700 and that’s with out all the other bits that will probably be a pain in an occupied property, price seems reasonable to me and as for completing it all in one day on your own, I doubt that personally...the other thing to consider when looking at the price is the spark has spent a few hours sourcing prices and writing uk the quote, that will be in the price....and unlike yourself he/she will have overheads in liability/indemnity/scheme costs/notifications cost and again more time writing up the certificates and notifications....I’d be charging approx £2800-£3000 depending on state of property and and ease of access ?



"Drill out back of kitchen unit to reveal water earth bond" - Is that just for inspection?
"Correctly terminate wiring for downlights" - what is actually needed here?

Yes to reveal if bond is there to confirm visually

I’d assume diy Dave has had a pop at installation of the downlights and now they need doing properly ?
 
Last edited:
Without looking at the job I get a price somewhere between your quote and Vortigerns estimate.

I am sometimes surprised by the quotes I see from other trades on jobs but the truth of the matter is it's not my field and the guys doing the work are making a living and there are costs involved I just don't see.
 
The problem is that people get hold of a well known companies catalogue and price things up from there. Of course you can buy 20 downlighters in there for about £100 and a board for about £150 (i haven't actually looked, just an educated guess). The other materials will add up to a bit so you can see what people compare things to but in reality there is no comparison.
An electrician will hopefully price for good quality materials that he has used before and would be happy to guarantee for a good while and this costs more.
As for labour, it would definitely take more than a day if it was done properly. I was always on the cheaper side for labour but there are so many costs involved now that these prices have to be charged.
At the end of the day you get what you pay for and with knowing you have a good electrical system safely installed then it is a price worth paying.
 
Hi,

"as for completing it all in one day on your own"

No, I said most of it. All the rubber grommets, everything mentioned on the immersion heater, all the downlights I could probably do in a day. Maybe not an 8h day but stil.

Anyway, fair enough, I will accept the quote. Doesn't sound like I have much choice, and if I do any of it myself, he'd need to go round and check it anyway.

Thanks both.
 
Yes, it probably is, it was just a bit of a shock out of the blue so wanted to get it confirmed.

Thanks again.
I bet if you sat down and factored in using the same materials the spark would use, these won’t be the cheapest available for good reason, then added your notification cost to LABC of approx £350 and by the time you add your own time on the difference will sound like a bargain ?
 
As an experienced DIYer myself I agree with the pros here. I reckon actual labour charges are higher than you've allowed for and the time for the job is likely to be much more than you estimated. All in all, given the scope of the works I think you've had a very reasonable quote. On labour charges, just consider what car dealers charge per hour... in no way are you being overcharged.
 
I don't have any grommets in my backboxes.
My question is:
What reg states this about the backboxes having grommets?
I know people say they are there for vibration but if the cables are buried in the wall then they are not going to move.
 
i'm on the cheaper side with quotes as my overheads are low ( van is 16 yrs old with 210,000 on clock) and i get a reduced state pension, but even so i'd be over 2K. so your quote is not excessive, as others have said.
 
The price seems reasonable to me as well.

yes it can be a bit of a shock when getting quotes to do jobs if you haven’t had anything like it done before.

This is the best place to come for honest advice. I done blame you for checking, because there are scammers out there.

if you’d come on and said some one had quoted you £3000- £4000 plus the responses would have
been very different.
 
I don't have any grommets in my backboxes.
My question is:
What reg states this about the backboxes having grommets?
I know people say they are there for vibration but if the cables are buried in the wall then they are not going to move.
Protection of sheath of cables against mechanical damage. Thermal cycling could have an effect over a long period of time. I would have thought though in many cases a C3 would be appropriate. Unless you can see actual damage. Anyone know what codebreakers says?
 
Protection of sheath of cables against mechanical damage. Thermal cycling could have an effect over a long period of time. I would have thought though in many cases a C3 would be appropriate. Unless you can see actual damage. Anyone know what codebreakers says?

What mechanical damage mate? They are plastered into a wall and are not moving. No damage to the sheath unless the things are moving.
 
yup. the grommet issue is a minor thing and should only warrant a C3 if that. get him to leave that part out and knock off the cost of 20 smokes and a couple of pints.
 

Reply to Advice on electrical quote in the UK Electrical Forum area at ElectriciansForums.net

Similar Threads

In a property with two consumer units one for the ring main etc., and the other for the 1970s storage heaters (storage heater CU looks like it’s...
Replies
14
Views
1K
In my bathroom there is supplementary bonding of the bath, bath pipework, and basin pipework before it goes into trunking and exits unconnected in...
Replies
6
Views
371
I have taken delivery of an undersink water heater. It is fitted with an RCD on the electrical supply cable which terminates with a euro-plug. I...
Replies
19
Views
2K
Until last week I had a dual tariff electricity supply with a cheaper overnight tariff. This was good for the storage heating, but now the storage...
Replies
2
Views
2K
Hi everyone Just looking for some advice and guidance on approaching my HNC in electrical engineering and bridging units. How did other people...
Replies
3
Views
614

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Electrical Forum

Welcome to the Electrical Forum at ElectriciansForums.net. The friendliest electrical forum online. General electrical questions and answers can be found in the electrical forum.
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock