Hello... Currently installing the sub mains for 4 flats. All flats are feed with 25mm swa, all single phase.
The election board have installed their meter and cut outs.
What method do you use to terminate the swa?
1. Install a galvanised trunking to make the ends off and then run in to the cut out?
2. Installed a metal din rail contaiment enclosure and use 25mm tails to connect into the cut out?
3.. Any other way you've done it.
The election board have installed their meter and cut outs.
What method do you use to terminate the swa?
1. Install a galvanised trunking to make the ends off and then run in to the cut out?
2. Installed a metal din rail contaiment enclosure and use 25mm tails to connect into the cut out?
3.. Any other way you've done it.