Hi,
Ive been asked to price for a board change in a flat.
I can see the incoming tails are 25mm. It's a PME install and the main fuse is about 50meters away at the end of the block.
The gas/water bonding is 2.5mm which I can access and upgrade to 10mm.
The issue is the earth which comes into the property looks to be a 6mm.
How do I stand about the main earth and not being able to upgrade due to access.?
Robo