Discuss Hi, can anyone offer any advice as to why the heating would run when HW is called for? in the Central Heating Systems area at ElectriciansForums.net

I don't know why dual pumps are not more popular. Given how long the better pumps last and how unreliable zone valves tend to be, I've always thought it a good idea. I put a dual pump system in 20 years ago for someone who was fed up with valve failures, and AFAIK both original pumps are still going. And in the days before intelligent pumps you could set the HW pump low and avoid having a bypass regulator. Then there was the SMC controller 3-port pump. Anyone remember those?
 
I don't know why dual pumps are not more popular. Given how long the better pumps last and how unreliable zone valves tend to be, I've always thought it a good idea. I put a dual pump system in 20 years ago for someone who was fed up with valve failures, and AFAIK both original pumps are still going. And in the days before intelligent pumps you could set the HW pump low and avoid having a bypass regulator. Then there was the SMC controller 3-port pump. Anyone remember those?

The modern Grundfoss pump plan systems never really caught on I the UK because they were not marketed much apparently.

Pump plan relays on check valves which are just another mechanical device in the heating medium circuit.

Two other issues are that modern bookers generally provide a pump overrun feature, thus allows the heat exchanger to Bd cooled after burner shutdown. To do this with two pumps requires a specialist programmer which appear to be fairly hard to come by.

Thd biggest factor is probably the level of electrical competency in heating engineers. Manny struggle with the standard wiring centre sbd would be unseen to deviate from this.
 
Two other issues are that modern bookers generally provide a pump overrun feature, thus allows the heat exchanger to Bd cooled after burner shutdown. To do this with two pumps requires a specialist programmer which appear to be fairly hard to come by.

Why on earth would you need a specialist programmer to allow a pump overrun? The programmer doesn't feature in the pump overrun at all.

All it needs is a relay to connect one of the pumps to the overrun terminal when there is no demand on the boiler switched live. The grundfoss pump plan included this in the simple, easy to connect wiring centre supplied with it.
 
Why on earth would you need a specialist programmer to allow a pump overrun? The programmer doesn't feature in the pump overrun at all.

All it needs is a relay to connect one of the pumps to the overrun terminal when there is no demand on the boiler switched live. The grundfoss pump plan included this in the simple, easy to connect wiring centre supplied with it.

I don’t know, you’d have to ask why Grundfoss decided to do it that way. The fact a relay in a box with wiring would require CE certification in order for it to be legally sold probably puts it beyond the scope of your average domestic electrician/heating engineer.
 
I don’t know, you’d have to ask why Grundfoss decided to do it that way. The fact a relay in a box with wiring would require CE certification in order for it to be legally sold probably puts it beyond the scope of your average domestic electrician/heating engineer.

The CE certification is the manufacturers problem, not the installer.
 
The CE certification is the manufacturers problem, not the installer.

One difference is where goods are imported from outside the EU, on which occasion the importer becomes liable for ensuring that goods are compliant. Not an everyday issue for most electricians, but potentially worth keeping in mind when sourcing items for those more unusual jobs.
 
One difference is where goods are imported from outside the EU, on which occasion the importer becomes liable for ensuring that goods are compliant. Not an everyday issue for most electricians, but potentially worth keeping in mind when sourcing items for those more unusual jobs.

What has that got to do with this?

I stated that grundfoss supplied a wiring centre which included the relay required for the pump plan system and now we are wandering off in the rhubarb talking about CE marking!
 
What has that got to do with this?

I stated that grundfoss supplied a wiring centre which included the relay required for the pump plan system and now we are wandering off in the rhubarb talking about CE marking!

Reading the previous comments again, it would seem that I've added nothing of relevance to the thread as I'd misunderstood the post you were replying to.

As such, you could file my comment under miscellanious information or ignore it completely.
 
The CE certification is the manufacturers problem, not the installer.

If you buy a number of electrical components and integrate them into an assembly or enclosure you are then classed as the manufacture of that assembly.

Irrespective of if the commoners used are CE marked the assembly as a whole must go through a product safety/conformance process.
 
If you buy a number of electrical components and integrate them into an assembly or enclosure you are then classed as the manufacture of that assembly.

Irrespective of if the commoners used are CE marked the assembly as a whole must go through a product safety/conformance process.

We are talking about a purpose made wiring centre, with relay fitted in it, that is supplied as part of the pump plan kit. The installer doesn't assemble it from components, they connect the cables from the various controls to the labelled terminals.

The manufacturer CE marks it, the installer installs it.
If the installer has to CE mark it then they have to CE mark every damn joint box, socket, light switch, light fitting or anything else they fit.
 

Reply to Hi, can anyone offer any advice as to why the heating would run when HW is called for? in the Central Heating Systems area at ElectriciansForums.net

Similar Threads

  • Locked
Hi, I realise this is an electrical forum and not plumbing, but was wondering if somebody could help. My heating is not working and the heating...
Replies
85
Views
4K
(Or that might be should a failed HW valve keep boiler running) Woke up this morning to find the boiler still running even though all timers off...
Replies
4
Views
1K
Hi Guys Changing my heating/water programmer and im stuck on the wiring ive gone from a danfoss to a Drayton and the wiring description is...
Replies
5
Views
995
I'm in Raleigh, North Carolina and have a well for my house's water supply. For some reason, pitless adapters, which allow all piping to be run...
Replies
1
Views
283
I have a fully pumped Y plan heating system using a Potterton EP2 programmer. Drayton MA1 Diverter valve. I have just replaced the Actuator head...
Replies
4
Views
608

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock