I need to provide Sub Main Isolation at main DB for secondary DB in extension.

I want to fit 80A Fused Main Switch at main DB then take tails from main Cu at load side of meter and fit to Fused Main Switch in then fit new tails from main switch out back into meter.

Finally fit sub main cable into main fused switch on the in side.

The problem is the 10mm2 sub main plus 25mm tails = to large for switch terminals.

100A switch will have same size terminals.

How can I solve this problem presuming it's a good idea in the first place.

Any advice would be much appreciated.
 
take tails out of existing CU and fit into henley blocks. then feed 1 pair of tails from henleys to existing CU and a 2nd pair to new S/F.
 

Similar threads

D
Replies
5
Views
4K
UK Electrical Forum
Deleted member 155212
D

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
Sub Main Isolator.
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
1

Advert

Thread statistics

Created
wcampbell,
Last reply from
telectrix,
Replies
1
Views
4,182

Advert