C
chloebear
Hi All,
I have a 50m run to extend services into a sub main in a new house. The majority of the run will be in 25mm 3core SWA - however once I get into the house and up into the loft, would it be acceptable to block this and change to 25mm meter tails. Reason for this is that handling the 25mm swa trough the loft area etc will be challenging to say the least.
I have a 50m run to extend services into a sub main in a new house. The majority of the run will be in 25mm 3core SWA - however once I get into the house and up into the loft, would it be acceptable to block this and change to 25mm meter tails. Reason for this is that handling the 25mm swa trough the loft area etc will be challenging to say the least.