D
domapegitashi
I have a burning q's that my friend wants to know as he is just showing interest in electrical stuff.
16mm2 2 core SWA is running between 10-15 m and is connected at one of the phase of the 3 phase supply (which has metal 3 phase distribution board) to other end at the plastic 1 phase distribution board. On this cable laying, does the separate CPC (16mm2) is require or not to run along with SWA? It required then how do you do this? any mechanical protection require for CPC?
I think it is easy to connect at the 3 phase metal distribution board using SWA and gland but any idea how to terminate the other end at plastic 1 phase distribution board as the cable is capable to damage the plastic board easily?
:confused5::confused5::confused5::confused5::confused5::confused5::confused5::confused5::confused5::confused5:
16mm2 2 core SWA is running between 10-15 m and is connected at one of the phase of the 3 phase supply (which has metal 3 phase distribution board) to other end at the plastic 1 phase distribution board. On this cable laying, does the separate CPC (16mm2) is require or not to run along with SWA? It required then how do you do this? any mechanical protection require for CPC?
I think it is easy to connect at the 3 phase metal distribution board using SWA and gland but any idea how to terminate the other end at plastic 1 phase distribution board as the cable is capable to damage the plastic board easily?
:confused5::confused5::confused5::confused5::confused5::confused5::confused5::confused5::confused5::confused5: