foghorn
was an emergency job as old fuse box blew up so had to change box network been out and disconnected main supply customer been without electric for three days
was an emergency job as old fuse box blew up so had to change box network been out and disconnected main supply customer been without electric for three days
I have one of these coming up. CU change had a quick look at it the other day noticed on one of the RFC that there is 3 cables going into rewireable fuse hoping one of them is just extra sockets that have being added. Going back check it out before doing board change though
? Ffs...not got it hear mate borrowed it got the brb though