O
OwenShand
I am coming towards the end of my apprenticeship and i'm hoping some of you guys can offer me some advice to help me hopefully pass 1st time.
Cheers, Owen
Cheers, Owen
As said above its perfectly achievable. Your biggest enemy is the clock however it is manageable just take your time and get through the work methodically.
Make sure your familiar with the follwoing items and you will be fine:
SWA glands
FP Cable
PVC Single circuits
2-way & Intermediate switching
3-phase motor circuits
S-plan (If i remember correctly) heating systems
Safe isolation procedure
Initial verification (Inspection & Test)
Fault finding
Good luck![]()
Haha ahh right fair enough..
I know they've cut a lot out the AM2 over the years but that would be taking the pee
cat5 is a joke to terminate imho.Yeah well I dont think theres a whole load more, there was some CAT5 I think
cat5 is a joke to terminate imho.
its easier than a socket as it tells you
brown here, white+brown here etc. just dont forget the tywrap.
did you not get an am2 pack? i got given a paper folder with a load of info
No containment of any kind!