C
craig1000
In brief - new bathroom going in and alterations required for inclusion of spot lights and a fan.
No RCD protection - old wylex rewirable - CPC's in all cables.
Main bonding not up to scratch - 6mm off the service cable sheath onto gas then into DB and then 6mm off DB that goes to water.
What is the minimum we have to insist upon before I say not prepared to touch it?
RCD protection is a must as I see it but am having the customer whinge regards cost and have seen people say about if the refuse then you can do the work and put the lack of RCD protection as a departure from the regs due to customers refusal to upgrade? Not even sure if I'd want to but just wondering thoughts so I know where we stand - finds that things are so often not conclusive in regs :-/
Such a minor cost to just divert the upstairs lighting through a RCD enclosure at the DB but they are still whining at the cost - beggers belief thousands on a new bathroom suite yet they never care for their electrical safety.
No RCD protection - old wylex rewirable - CPC's in all cables.
Main bonding not up to scratch - 6mm off the service cable sheath onto gas then into DB and then 6mm off DB that goes to water.
What is the minimum we have to insist upon before I say not prepared to touch it?
RCD protection is a must as I see it but am having the customer whinge regards cost and have seen people say about if the refuse then you can do the work and put the lack of RCD protection as a departure from the regs due to customers refusal to upgrade? Not even sure if I'd want to but just wondering thoughts so I know where we stand - finds that things are so often not conclusive in regs :-/
Such a minor cost to just divert the upstairs lighting through a RCD enclosure at the DB but they are still whining at the cost - beggers belief thousands on a new bathroom suite yet they never care for their electrical safety.