Discuss Old ISCO, just interested in the vintage in the UK Electrical Forum area at ElectriciansForums.net

happysteve

-
Esteemed
Arms
Supporter
Reaction score
2,115
Nice old iron-clad service cutout, just wondered how old it is?

Apparently the smart-meter fitter took one look at it and said, "I'm not touching that, this is a job for Western Power." I'll get the client to ask nicely for PME while they're at it, and an isolator (currently TT, Victorian semi)

20201001_212752.jpg
 
Nice old iron-clad service cutout, just wondered how old it is?

Apparently the smart-meter fitter took one look at it and said, "I'm not touching that, this is a job for Western Power." I'll get the client to ask nicely for PME while they're at it, and an isolator (currently TT, Victorian semi)

View attachment 61155
That is class , That tacky tape spoils the pic.
 
Probably '30s, may have been installed for DC supply. Would be very interested to see if could be rescued for the museum!
 
Totally needs updating asap. Items like these are prohibited in landfill, they must be sent to our warehouse for processing and converting into beers.
 
Nice old iron-clad service cutout, just wondered how old it is?

Apparently the smart-meter fitter took one look at it and said, "I'm not touching that, this is a job for Western Power." I'll get the client to ask nicely for PME while they're at it, and an isolator (currently TT, Victorian semi)

View attachment 61155
Hello Happy Steve.
This type of metalclad cu-out was used well into the 1950s; the design probably dates from the 1930s. Safe enough if left alone, but potentially very dangerous if disturbed. Often the biggest hazard with these is a worm-eaten meter board crumbling away and leaving the cut-out with weakened support. The meter board in the photograph looks ok from that perspective.
Regards,
Colin Jenkins.
 
Thanks folks, great to learn a bit about old gear. :)

There's no issue with the cut-out pictured itself; clearly no-one's going to touch it, but it's not in any danger of falling off the wall. I was there doing an EICR, and the client mentioned that they'd asked to have a smart meter installed but the work got postponed because of this.

The property would benefit from PME (and I suspect it's available, since it's an underground supply in an urban setting), and an isolator while they're at it; the client is happy to approach WPD to pay for that aspect of the work to be done.

If we can persuade them to leave us the old cut-out, I'll post it to Lucien Nunes :)
 
Thanks folks, great to learn a bit about old gear. :)

There's no issue with the cut-out pictured itself; clearly no-one's going to touch it, but it's not in any danger of falling off the wall. I was there doing an EICR, and the client mentioned that they'd asked to have a smart meter installed but the work got postponed because of this.

The property would benefit from PME (and I suspect it's available, since it's an underground supply in an urban setting), and an isolator while they're at it; the client is happy to approach WPD to pay for that aspect of the work to be done.

If we can persuade them to leave us the old cut-out, I'll post it to Lucien Nunes :)
WPD will change that free of charge. if some office desk pilot tries to charge just tell them client is getting an ev charger and solar. they then have to change cut out for free to facilitate these technologies as part of some ofgem directive. if you are lucky they will fit an isolator for free if you supply one on site. but some are a bit cagey as its not wpd supplied and leave it isolated for 10 mins whilst you fit an isolator on the tails. given wpd will be changing cutout the charge for the isolator should be less than the usual £170 they currently charge!
Cant fault WPD - had them out yesterday, they pulled fuse on really old cutout so i could replace main switch in the fuse board that had jammed shut during EICR and couldn't turn back on. from call to arriving took less than an hour.
 
WPD will change that free of charge. if some office desk pilot tries to charge just tell them client is getting an ev charger and solar. they then have to change cut out for free to facilitate these technologies as part of some ofgem directive. if you are lucky they will fit an isolator for free if you supply one on site. but some are a bit cagey as its not wpd supplied and leave it isolated for 10 mins whilst you fit an isolator on the tails. given wpd will be changing cutout the charge for the isolator should be less than the usual £170 they currently charge!
Cant fault WPD - had them out yesterday, they pulled fuse on really old cutout so i could replace main switch in the fuse board that had jammed shut during EICR and couldn't turn back on. from call to arriving took less than an hour.

Never dealt with WPD as not my area but UKPN would no doubt have been an absolute nightmare to deal with in the same circumstances.

I had a good one with them recently. Requested PME at customers house. Even had the ‘PME available‘ label next to the meter, albeit a few years old. They arrived and refused to supply the connection as their tester read ze as 0.56. Mine and my colleagues testers both read 0.29. They tried theirs again and it said 0.40. Seems like they had a dodgy piece of equipment to me. No matter, they still refused to fit. Meant me putting an s type RCD on a distribution circuit. Not ideal.

Another one recently. They turned up to move cutout. The customer had paid them extra to also move meter as their energy supplier wouldn’t send anyone out due to Covid (pathetic but I digress). They move the cutout and then casually ask if customer has booked their meter to be moved that day with supplier. Then decide that they don’t want to do it after being told the score and call their office. Office sends another team out later that day to move meter. Fecking pathetic. Surely the job of moving the cutout is both more dangerous and time consuming than a couple of wood screws and 4 terminations on isolated cables to fit a meter.
 

Reply to Old ISCO, just interested in the vintage in the UK Electrical Forum area at ElectriciansForums.net

Similar Threads

Morning All I recently completed my first re wire and board change, (with help from the owner who is a gas fitter and plumper, who works with my...
Replies
0
Views
1K
An interesting phone conversation with my own electricity supplier (Good Energy) which was very disappointing, and made me sigh (professionally)...
Replies
23
Views
9K
While doing a few initial tests during a quote for a rewire the ZE results were around the 3 ohm mark on what appeared to be a TNS system. An old...
Replies
0
Views
1K
Hello I have been working with electrical sector since 1980 , timeserved electrical fitter, electrical machine tool fitter, test and development...
Replies
9
Views
1K
S
Client's cooker/hob stopped working - he called his service plan chaps and they said the cooker and hob were fine, but it was the supply, so he...
Replies
5
Views
2K
Scotford14
S

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Electrical Forum

Welcome to the Electrical Forum at ElectriciansForums.net. The friendliest electrical forum online. General electrical questions and answers can be found in the electrical forum.
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock