Just checking the correct way to do a twin inverter system feeding into Inverter/charger set up. 2 x inverters AC outputs go to separate isolators then each isolator goes to separate MCB's and from there into Henley block to feed into generation meter (for FIT's) then into another Henley block to connect to inverter charger output (from batteries) which feeds building circuits via existing DB with CU. So we are only measuring generated PV from inverters.
So I don't need a garage CU but just a twin MCB enclosure on DIN rail for the inverter supplies.
Can we use these? (image has cartridge fuse holder not MCB).
So I don't need a garage CU but just a twin MCB enclosure on DIN rail for the inverter supplies.
Can we use these? (image has cartridge fuse holder not MCB).