Thanks pjcomp! Reading through other threads I have noticed once 1 person says 'you dont know what your doing' etc etc others seem to jump on the band wagon and it starts to get insulting.

Sorry I probably shouldn't have said ive NEVER done a EICR as ive done the 2391 course so know the theory and have tested a 3Ph installation filling out a EICR in the practical exam however this doesn't contain contactors etc and as im sure your all aware things are a lot different out in the field.

I asked the question on here to get a second opinion from people that are more experienced in commercial/industrial installations. I know its hard to give advice with out seeing the job in person but any advice (apart from 'i shouldnt be doing it') would be helpful! Some of the earlier replies in this thread have been so thanks for that :)
 
Spartykus - I understand where your coming from and agree that little knowledge is dangerous but the ONLY bit im not 100% sure on is this particular enclosure. The rest of the property/installation is all single phase individual circuits that are common in domestic situations. Id be silly to turn this job down in the current climate just because of an enclosure i'm not familiar with. The idea of asking the question is to get more familiar with it ;) Thanks
 
Cool man, I never mean to belittle or dig. As you say it is hard to advise via a forumfor something like that but I catch the drift. Just that bit in the piccy is the chewy bit.

hope it goes well.
 
So who of the experienced ones are going to put their time where their mouth is and offer to go with him to allow him to learn? Or do we leave all that to someone else?
 
Check the requirements for over current protection in BS7671. It feeds a time clock, a switch basically. Is this likely to cause overcurrent?.

Although is the cable liable to damage and how far is the timeclock away?. Have a poke around the section (oh er).

Check the neutral to make sure theres no fuse in there!.
 
As an example I quoted to PIR a service station. It was my find but I asked a commercial tester who does these things (I dont) to do the work with his team- he was prepared to let me help & learn under supervision.

That is exactly what I would do. I'm plenty confident in a domestic environment, and I understand the theory of 3-Phase, but the gubbins look all different! That's why I generally won't touch it. BUT...if I were to get a job I was mostly happy on, with one sticky bit - say a large building with 3-Phase supply and 3 DB's to supply domestic kit, then I wouldn't walk away. I'd find a guy who would take the time to explain and allow me to watch him do his stuff, helping if I could, pay him for his time and crack on.
As for different responses to those of us who, like myself, are 'Domestic Installers'; well, it's a big world out there and over the years I have grown shoulders (and stomach :blush5:) to match. It can get 'hot' in here, but I asked to come in so I have to accept that sometimes I'm gonna get a clobberin'. Fair enough, that's how we learn, but we ALL have to start somewhere, ALL of us! And speaking from someone who started out in heavy industry on Tyneside in the late '70s (talk about sh1te timing!) older, time served guys THEN were slagging off us newbies for coming in without having any experience or idea how it 'SHOULD be done this way, 'cos it's ALWAYS been done this way' and these 'modern qualifications' were not fit for purpose. They often ended up getting ignored because it was always the same response which was a shame, because they had a lot to give. That experience taught me a lot about how I would behave if I ever reached there exalted status of expertise (which I didn't, not in engineering anyway!)
Well, having prodded the hornets nest I'm getting my tin hat on, a large packed lunch and a flask of char and I'm heading to my bunker! :laugh3:
 

OFFICIAL SPONSORS

Back
Top