Now I know why people quote cheaper than me.
I put a CU into a granny flat onto a new PME supply, also wired them a single socket so other trades had power to complete the refit.
I quoted to do the electrical install as well. 1 x Ring final 8 twin switched sockets. 1 x 8kw shower, 6kw hob, single oven with 13a plug top, 2 lighting circuits, and 2x 20a radials for electric heaters, and all the control bits that go with the system.
Didn't get the job, but never gave it much thought. BUT this afternoon the phone rings, "You did some work in our granny flat a while back, and we need some more doing".
I went up and had a look earlier, the sparky quoted £150 less than me, so he got the original job. Now he cant come back, he has not put in a supply for 32a hob, told them it just needed a plug, no supplies installed for heaters, shower done in 4mm cable, lights not correct IP rating for shower enclosure.
They want me to quote to put it all right and certify, "Sorry mate i cant certify what i haven't done, and i will put a quote in the post for the rest of it".
If he had gone with my price originally then he would have only paid once and it would have been right. I explained that i charge what i do for a good reason, and enquired as to which Part P body the other lad was with, erm none was the reply.
I told him to put it down to experience and he doesn't know it yet but i am going to quote what i quoted originally for less than half of the work in the original quote. If he doesn't like it, then he can bollox, i will go play golf on Friday instead.
Cheers.........Howard
I put a CU into a granny flat onto a new PME supply, also wired them a single socket so other trades had power to complete the refit.
I quoted to do the electrical install as well. 1 x Ring final 8 twin switched sockets. 1 x 8kw shower, 6kw hob, single oven with 13a plug top, 2 lighting circuits, and 2x 20a radials for electric heaters, and all the control bits that go with the system.
Didn't get the job, but never gave it much thought. BUT this afternoon the phone rings, "You did some work in our granny flat a while back, and we need some more doing".
I went up and had a look earlier, the sparky quoted £150 less than me, so he got the original job. Now he cant come back, he has not put in a supply for 32a hob, told them it just needed a plug, no supplies installed for heaters, shower done in 4mm cable, lights not correct IP rating for shower enclosure.
They want me to quote to put it all right and certify, "Sorry mate i cant certify what i haven't done, and i will put a quote in the post for the rest of it".
If he had gone with my price originally then he would have only paid once and it would have been right. I explained that i charge what i do for a good reason, and enquired as to which Part P body the other lad was with, erm none was the reply.
I told him to put it down to experience and he doesn't know it yet but i am going to quote what i quoted originally for less than half of the work in the original quote. If he doesn't like it, then he can bollox, i will go play golf on Friday instead.
Cheers.........Howard