bearlyable

Im to run cables in a renovation/new build which has stone walls on the outside then block work inner skin which is to be dry lined using dot and dab, should the cables be covered with channelling or conduit prior to the dot and dab being done or are they better just being left open and clipped to the wall..all constructive comments are appreciated as this is new too me. Cheers
 
  • Like
Reactions: WGB1997
Thanks for link it'll come in handy, I am aware of the regs I am curious of opinion of people who actually do it day in day out what they find to be the best way for them eg clipped to wall or within conduit/trunking.
Thanks for your attention.
 
I always put them in something, as it keeps the job tidy and is easier to fix to wall, especially if the walls are thermalite
 
I use channelling where possible
Neat,cheap, quick/easy to fit
Its possible to replace cable if the need arises without tugging at and breaking cable clips also the cables would no longer be fixed
 
I also use a bit of oval, easy to use and cheap, plus if you ever have to rewire, the cables should come out very easily.
 
I would suggest conduit as it will make it easier to re-wire or pull in extra cables in the future.
 
I always clip direct to the wall when they are going to dot and dab the walls. the only time i would generally use capping etc is if they are going to wet plaster the walls. there is no need to eart the capping that im aware of, (please correct that and explain if im wrong) if the cables are run in the "safe zones" and are rcd protected etc.

as for future rewire, cross that path if/when you come to it, (has anyone done a rewire in a property they have previously rewired??)

thanks Ross.
 
I always clip direct to the wall when they are going to dot and dab the walls. the only time i would generally use capping etc is if they are going to wet plaster the walls. there is no need to eart the capping that im aware of, (please correct that and explain if im wrong) if the cables are run in the "safe zones" and are rcd protected etc.

as for future rewire, cross that path if/when you come to it, (has anyone done a rewire in a property they have previously rewired??)

thanks Ross.


Thank god 4 that Ross I thought I was the only one thinking it!! Clip away old boy!
 

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

YOUR Unread Posts

Daily, weekly or monthly email

Thread Information

Title
how to run cables prior to dot and dab dry lining
Prefix
N/A
Forum
Electrical Wiring, Theories and Regulations
Start date
Last reply date
Replies
9

Thread Tags

Advert

Thread statistics

Created
bearlyable,
Last reply from
super_stuey,
Replies
9
Views
24,572

Advert