J
JL_Electrical
I'm unhappy that I've lost out on a job recently because I priced to do the job correctly and another contractor has agreed to bodge it and scarper. The job is wire some roller shutter doors x 3 in an industrial unit. The board is an old bill rewireable board fed in what is at best 6mm SWA four core, which joints on to pyro and back to SWA over about a 50m run. There is no way you can ascertain ZS, condition of joints (inaccessible high level), volt drop etc. I was going to pull in a new dedicated sub main and have each shutter on it's own circuit. Also there the existing board is fed off another board with 3 rewireable fuses. I know people are short of work, but I hate cowboys. Also I now look like the expensive one to the customer so it puts me back down the list for trying to do things right.
Might well end up getting my head kicked in? Opinions. No doubt the NICEIC won't be interested anyway, they won't want to lose out on his £500 to display their badge of honour now will they?
Might well end up getting my head kicked in? Opinions. No doubt the NICEIC won't be interested anyway, they won't want to lose out on his £500 to display their badge of honour now will they?