brucelee
hi everyone,
just want to know if it ok to wire 3 pir floods off immersion ie 16a at ccu but fused down to 5a with sw/f/spur is it poss to wire two fused spurs then to two seperate switches two floods on 1x 2 g 2way from 1 sw/f/spur and one of the other is this ok as impossible to get back to mains through wood flooring upstairs then 1mm to individual switches from each fused spur then into loft at point where they leave the building will use adaptable boxes with 1mm flex to the outside lights is this ok or anybody else any ideas
just want to know if it ok to wire 3 pir floods off immersion ie 16a at ccu but fused down to 5a with sw/f/spur is it poss to wire two fused spurs then to two seperate switches two floods on 1x 2 g 2way from 1 sw/f/spur and one of the other is this ok as impossible to get back to mains through wood flooring upstairs then 1mm to individual switches from each fused spur then into loft at point where they leave the building will use adaptable boxes with 1mm flex to the outside lights is this ok or anybody else any ideas