sparkshower
Hi
so in this case then if the board is to be changed with the necessary labels/warnings and the correct fittings etc etc to get around the obstacle of metal backboxes that could be earthed what is the normal process here?
Is it required to test (long lead) between the metal screws/backboxes before having to change the screws to nylon ones, also are the switches with the screw covers acceptable to avoid the issue, (what if these fall off over the years)
thanks in advance
so in this case then if the board is to be changed with the necessary labels/warnings and the correct fittings etc etc to get around the obstacle of metal backboxes that could be earthed what is the normal process here?
Is it required to test (long lead) between the metal screws/backboxes before having to change the screws to nylon ones, also are the switches with the screw covers acceptable to avoid the issue, (what if these fall off over the years)
thanks in advance