Can anyone confirm/refute this for me?
Last week Western Power changed the mains head on a job I was doing. Two guys, working live, had a good chat with them about what they were doing, so I know they were.
This week, on another job, an Eon site surveyor tells me they don't do live work, and to change a mains head they have to dig up outside and it will involve interrupting the supply to the adjacent three premises ..... Same job, diffferent supplier.
Are they giving me the run around? Or do the different DNSs have their own policy?
Thank guys.
Last week Western Power changed the mains head on a job I was doing. Two guys, working live, had a good chat with them about what they were doing, so I know they were.
This week, on another job, an Eon site surveyor tells me they don't do live work, and to change a mains head they have to dig up outside and it will involve interrupting the supply to the adjacent three premises ..... Same job, diffferent supplier.
Are they giving me the run around? Or do the different DNSs have their own policy?
Thank guys.