Got a call today (new I shouldn't post so often on here :) ) an end user has a Power-One PVI-3.0-TL-OUTD - with an E031 error (failed grid relay).

I've given him the contact details of ABB to arrange the replacement unit, however he needs someone local to swap it over for him.

There's the usual fee in it from ABB :)

He's Plymouth area so a little far for us to go!

Which of you guys is based down that way and can swap it over for him?

Reply here, or PM me if you'd prefer
 
No we ordered one last week. They send the replacement out and you swap if. Takes about a month to arrive!
Had An SMA 10000tl pack in last week. Called SMA, replacement arrived next day!
 
No we ordered one last week. They send the replacement out and you swap if. Takes about a month to arrive!
Had An SMA 10000tl pack in last week. Called SMA, replacement arrived next day!

Only a month ? Last summer it took them 12 weeks to send one out , Same SMA experience, called last Monday re a faulty Tripower, replacement was on site by Thursday :)
 
There's a cut off date, not sure when it is now but all those before that date do. Think it's around 2012-13 but not sure.
 
Does ABB pay the end user any compensation for lost generation?

Yes. There's a form to complete and it's based on system size, installation date and duration of downtime, iirc.

There's no accounting for whether the lost generation is in summer or winter, afaik.
 
Yes. There's a form to complete and it's based on system size, installation date and duration of downtime, iirc.

There's no accounting for whether the lost generation is in summer or winter, afaik.
I think they stopped that a while back
 
I think they stopped that a while back

I may be wrong but I think it depends on the date the original inverter was commissioned. Before 01/06/13 and you got paid. Afterwards, nowt - unless you upgraded to an "Advantage" warranty.

I replaced a couple last year (the infamous E031 fault) and both householders got compensated for lost generation.
 
I've been waiting over 2 weeks for a Samil....

Lucky you. I waited over 4 months for 9 Samils. Housing association in Birmingham has 130-odd of them onsite. So far over 20 have failed. Samil have been next to useless in sorting replacements out - deny all knowledge of the claim (despite the same person processing it originally), never phone back and never answer emails.
 
Buy cheap today, regret at length tomorrow...
Hence the reason unless customer specifies otherwise, for the last 24 months we've only installed SMA and SolarEdge
 
I agree. Lucky me inherited the maintenance of this lot. Planning to talk to them into ditching failures and replacing with something half decent
 
  • Like
Reactions: 1 person

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Email
Joined
Time zone
Last seen

Thread Information

Title
Installer needed - Plymouth area to fit replacement Power-one Inverter.
Prefix
N/A
Forum
Solar PV Forum | Solar Panels Forum
Start date
Last reply date
Replies
13

Advert

Thread statistics

Created
Worcester,
Last reply from
JulianC,
Replies
13
Views
2,659

Advert