adderzigzag

What does anyone think the maximum period between period inspection on holiday cottages should be?

Guidance note 3 is not too clear. I'm sure there are many installations which don't drop into the catagories as detailed in Table 3.2

My best suggestion is "Restaurants and Hotels", or "Residential" both of which is 5 years this however seems a long time to me, any thought?
 
In my experience, this situation calls for a Routine check to be completed once per year as in table 3.2 of guidance note 3 and a full PIR every 5 years. Look at the top of table 3.2 above heading 2 it also says to look at sub clause 3.5 which points out on page 61 the checks to be carried out during routine checks.
you are correct that 5 years is too long and that is why we do routine checks in the interim period which don't take as long as they are not as in depth.:)
Hope this was helpful:cool:
 

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
Period Inspection Report - Holday Cottages
Prefix
N/A
Forum
Periodic Inspection Reporting & Certification
Start date
Last reply date
Replies
1

Advert

Thread statistics

Created
adderzigzag,
Last reply from
miner69er,
Replies
1
Views
2,208

Advert