Hey perhaps Avery1 will be along shortly, anyway.... I dont understand your question, perhaps TT it?
 
  • Like
Reactions: 1 person
When you say no earth what do you mean?,no provision of earth from cutout, Some suppliers do not provide earth from cut out, if that is the case when meter fitted etc, they should break out the NE terminal (pme) ready for you to connect into cutout,they should also leave the stated nominal voltage plus ze of the supply.
 
When you say no earth what do you mean?,no provision of earth from cutout, Some suppliers do not provide earth from cut out, if that is the case when meter fitted etc, they should break out the NE terminal (pme) ready for you to connect into cutout,they should also leave the stated nominal voltage plus ze of the supply.

they won't provide a Ze if they ain't supplying a earth.
 
they won't provide a Ze if they ain't supplying a earth.

Correct, all I am saying is if its pme from cut out some suppliers do not provide earth from it, but DNO must provide their earth loop impedance measurement.
 
Aaaaaaaargh!!!!

:banghead: :banghead: :banghead:
 
  • Like
Reactions: 3 people
sorry been out ,yeah no earth at all looks like tt never seen one

well get us a bloody photo, then. nobody here is a mind reader.
 
Are you out in the sticks or in a built up area .... maybe your lack of experience just means you don't recognise the service head provided may have a N/E combined block but you dont have access to it... can you post a pic if possible?

If you have never seen a TT then i can assume your experience is limited ...well we all start somewhere ;)
 
Earth won't come out the meter. I've had few one upgrades where they never punch the hole out for earth at the cut out, if the fuse fell out you would see the n-e link , is the head marked one or cne earth?
 
The mind boggles.

Mine's Boggled as well.

Must be an age thing,

Read "New supply",, Thinks DNO must have have test cert of some sort (Don't do domestic but read it on here)

"Only Brown / Blue out of meter",, Thinks supplier must have fitted meter, so consumer unit must be in place
????
 
Christ... A 5 minute phone call would have cleared this up. It's blatantly a PME... At a guess ;-)
 
to the o/p...

on the cutout is there a hole or two to one side ....with little allen screws in them?

if so then this is the earthing point...

is the cutout grey Henley?
 
to the o/p...

on the cutout is there a hole or two to one side ....with little allen screws in them?

if so then this is the earthing point...

is the cutout grey Henley?

Don't waste your breath Glenn. Not worth the effort.
 
its nearly as bad as watching my girlfriends 16 year old son cutting an unsliced loaf of bread earlier but holding the cut slice!!!!
 
  • Like
Reactions: 4 people
There are times when this forum needs an insane questions section then a filter built in to exclude them from appearing in the new posts lists
 
  • Like
Reactions: 1 person
i can smell the epic fail of this thread from all the way over the other side of the interwebz.

you guys should get some air freshener.

lol.
 
  • Like
Reactions: 2 people
HANG ON....this doesn't make sense. The DNO don't do meters, they just do heads, yes? And the meter fitter won't normally just put a tails in and energise them without knowledge of what's on the other side of them, nor (in my experience) will they fit a meter without fitting the tails in as they like to seal it all up...... so, there must have been a set of tails left there by the OP ready for the meter fitter (along with some sort of assurance of isolation downstream). Where was the installers earthing conductor???

If you don't bring them a cable then they can't fit it!!!!!!!!!!!!!!
 
  • Like
Reactions: 1 person
its nearly as bad as watching my girlfriends 16 year old son cutting an unsliced loaf of bread earlier but holding the cut slice!!!!

With 24hrs training and registration on a Bakers scam, he would be an ideal candidate to be running the instore Bakeries for a Major supermarket.
Experience in button pressing would reduce the training significantly.
 
HANG ON....this doesn't make sense. The DNO don't do meters, they just do heads, yes? And the meter fitter won't normally just put a tails in and energise them without knowledge of what's on the other side of them, nor (in my experience) will they fit a meter without fitting the tails in as they like to seal it all up...... so, there must have been a set of tails left there by the OP ready for the meter fitter (along with some sort of assurance of isolation downstream). Where was the installers earthing conductor???

If you don't bring them a cable then they can't fit it!!!!!!!!!!!!!!

My thoughts in post 23.
 
Identifying service heads, metering and earthing arrangements was obviously day 18 of the 17 day course or Monday of week 6 of the five week course

or

Is this now an additional City & Guilds course with it's own course number that you need if you are arranging for new supplies or metering to be installed
 
  • Like
Reactions: 2 people

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
uk

Thread Information

Title
new supply been put today to new building ,NO EARTH
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
82

Advert

Thread statistics

Created
baazab,
Last reply from
Sparkie30,
Replies
82
Views
8,604

Advert