just got the call . . . . i passed C&G 2391 course!
did everyone find out today?
did everyone find out today?
- TL;DR
- C&G 2391 course
Last edited by a moderator:
If I was this lecturers boss and I heard him say that he would have been out on his arse. Lecturers/teaches are there to support their students and encourage them to learn not only to pass an exam but give them the skills that can be used in the real world. I was very lucky with my 2391 as I had two outstanding teachers who would take the extra time to help people through and pass on real life experience.1st week lecturer said " chances are 7 out of 10 of you are going to fail. I'll leave you to decide if you wish to stay"
And that was the first week


I had little practical experience before taking the 2391 and although I struggled a bit I didn't find it that bad. One week of my Electrical Trainee course.
We barely covered 3 phase, with just some basic testing to carry out on circuits. I have a very basic understanding of 3 phase and managed OK.
Having 2392 will help you no end as you are already carrying out a lot of the tests required, main thing is the theory side which you will be taught on the course.
Usual publications such as BS7671 and on-site guide will help but the main one you need is guidance note 3 which covers inspection and testing. GN3 has all the required information as to what testing, how to test and what paperwork to complete.
If you search the net for 2391 exam questions you will find previous papers which will give you an idea of what to expect. Some decent examples here: City & Guilds 2391 Revision Questions
When answering the questions they want the full name, not their short or common names i.e. Main Earthing Terminal not MET. Circuit Protective Conductor not CPC etc.
Section B of the exam is your big points winner as this covers a scenario, they'll give you all the details you need and several tasks for example.
You have been requested to carry out an EICR on a small commercial shop with an office etc. They also require an additional radial circuit to supply socket power to a small storeroom.
What paperwork is required for the above?
You then list all of them including any relevant schedules of inspections and schedules of test results.
One question I had was how would you carry out a continuity test on a main earth bonding conductor measuring 15m in length. The answer was to go through the full process and what method you would use, including any safety points such as isolating the supply, warning people of trip hazard due to wander lead, recording results. Miss any critical parts and you will more than likely loose all the points for that question which could total up to 15.
Just a case of 'getting your ducks in a row' and working through it methodically.
No doubt by the time I've finished typing this someone else will have come in with a better and wittier reply...![]()