D

Dave-Titan

just got the call . . . . i passed C&G 2391 course!

did everyone find out today?
 
TL;DR
C&G 2391 course
Last edited by a moderator:
I just did the exam to! I think it was quite straight forward however im concerned i messed up the question about checking the carpark radial?

Does that just mean 'checks' ie cable condition, earthing, terminations etc and not any testing as it only stated CHECK.

Also I have never tested an RCBO and in a blind moment of panic i decided you should remove the earth tail from the rcbo ? THis was an idiotic thing to write but will i lose all marks for that question because i answered it pretty well apart from that stupid comment !!!

Apart from that im quite happy !!

How did others find it??
 
Upvote 0
Well for earth electrode question i wrote

Ze - external earth fault loop impedance
PFC - prospective fault current
Rcd test as its said state 3, and it could have been any id of thought


The rest was surprisingly easy, did everyone manage to get the last question correct by applying 80% rule of thumb to the max values?

I got "not acceptable" for the first three and "acceptable" for the last value
 
Upvote 0
I just did the exam to! I think it was quite straight forward however im concerned i messed up the question about checking the carpark radial?

Does that just mean 'checks' ie cable condition, earthing, terminations etc and not any testing as it only stated CHECK.

You may of had a different paper to me as as I had to write a sequence of test on the continuity of the car park lights that incorporated 2 core SWA.

I may have struggled?
 
Upvote 0
I did it as well. Trying not to think about it because there's a few questions I think I may have messed up.
I got 'not acceptable' for the first 3 results as well, although earlier in the question I said the tabulated figures can be compared to measured results either by multiplying the tabulated by 0.8, or multiplying the measured results by 1.2, which doesn't work.

What did everyone else put for the voltage to test surge protected sockets?
And the voltage to test between SELV and a 400v 3 phase motor?
 
Upvote 0
i did it as well. Trying not to think about it because there's a few questions i think i may have messed up.
I got 'not acceptable' for the first 3 results as well, although earlier in the question i said the tabulated figures can be compared to measured results either by multiplying the tabulated by 0.8, or multiplying the measured results by 1.2, which doesn't work.

What did everyone else put for the voltage to test surge protected sockets?
And the voltage to test between selv and a 400v 3 phase motor?


500 v d.c
 
Upvote 0
An office wired 12 years ago, BS88 100A main fuse, wired in pvc singles in pvc conduit and trunking.
5 metal bollards in car park wired in 2 core SWA controlled by a time clock and contactor.
3 phase board next to the service head, TN-S earthing.
A new occupier had just moved in and an EICR needed to be carried out, tested at 20°c.

Can't remember much more than that.
 
Upvote 0
I wrote 250v d.c purely because SELV was mentioned

The question was about verifying electrical seperation between 400v 3 phase motor and. 25v SELV circuit


As for surge protection i wrote 250v d.c
 
Upvote 0
I went for 500v between SELV and 3 phase because you're testing for leakage between the two. I remembered the secondary side should be tested at 250v but you test at 500v between each side of the transformer.

I thought the surge protection was relevant otherwise they wouldn't have mentioned it, so I said 250v and explained myself by suggesting it was to prevent damage to the surge protection and misleading results.
 
Upvote 0
I just did the exam to! I think it was quite straight forward however im concerned i messed up the question about checking the carpark radial?

Does that just mean 'checks' ie cable condition, earthing, terminations etc and not any testing as it only stated CHECK.

You may of had a different paper to me as as I had to write a sequence of test on the continuity of the car park lights that incorporated 2 core SWA.

I may have struggled?

I'm sure i had a continuity one of the carpark lights too but that was the next question after the check one! God knows il just hope for the best
 
Upvote 0
An office wired 12 years ago, BS88 100A main fuse, wired in pvc singles in pvc conduit and trunking.
5 metal bollards in car park wired in 2 core SWA controlled by a time clock and contactor.
3 phase board next to the service head, TN-S earthing.
A new occupier had just moved in and an EICR needed to be carried out, tested at 20°c.

Can't remember much more than that.


3 phase 230/400.

I thought the scenario mentioned that the owner want a periodic inspection report so that what I wrote down along with schedule of inspectiona and tes results
 
Upvote 0

OFFICIAL SPONSORS

OFFICIAL SPONSORS

Thread statistics

Created
Dave-Titan,
Last reply from
Hristo99,
Replies
1,389
Views
430,255