I just did the exam to! I think it was quite straight forward however im concerned i messed up the question about checking the carpark radial?
Does that just mean 'checks' ie cable condition, earthing, terminations etc and not any testing as it only stated CHECK.
Also I have never tested an RCBO and in a blind moment of panic i decided you should remove the earth tail from the rcbo ? THis was an idiotic thing to write but will i lose all marks for that question because i answered it pretty well apart from that stupid comment !!!
I did it as well. Trying not to think about it because there's a few questions I think I may have messed up.
I got 'not acceptable' for the first 3 results as well, although earlier in the question I said the tabulated figures can be compared to measured results either by multiplying the tabulated by 0.8, or multiplying the measured results by 1.2, which doesn't work.
What did everyone else put for the voltage to test surge protected sockets?
And the voltage to test between SELV and a 400v 3 phase motor?
i did it as well. Trying not to think about it because there's a few questions i think i may have messed up.
I got 'not acceptable' for the first 3 results as well, although earlier in the question i said the tabulated figures can be compared to measured results either by multiplying the tabulated by 0.8, or multiplying the measured results by 1.2, which doesn't work.
What did everyone else put for the voltage to test surge protected sockets?
And the voltage to test between selv and a 400v 3 phase motor?
An office wired 12 years ago, BS88 100A main fuse, wired in pvc singles in pvc conduit and trunking.
5 metal bollards in car park wired in 2 core SWA controlled by a time clock and contactor.
3 phase board next to the service head, TN-S earthing.
A new occupier had just moved in and an EICR needed to be carried out, tested at 20°c.
I went for 500v between SELV and 3 phase because you're testing for leakage between the two. I remembered the secondary side should be tested at 250v but you test at 500v between each side of the transformer.
I thought the surge protection was relevant otherwise they wouldn't have mentioned it, so I said 250v and explained myself by suggesting it was to prevent damage to the surge protection and misleading results.
An office wired 12 years ago, BS88 100A main fuse, wired in pvc singles in pvc conduit and trunking.
5 metal bollards in car park wired in 2 core SWA controlled by a time clock and contactor.
3 phase board next to the service head, TN-S earthing.
A new occupier had just moved in and an EICR needed to be carried out, tested at 20°c.
I thought the scenario mentioned that the owner want a periodic inspection report so that what I wrote down along with schedule of inspectiona and tes results
This is the main Electrical Courses at ElectriciansForums.net.
Find local recommended electricians courses. Avoid training "company" scams. Always go view the training centre before booking any electrical courses.