just got the call . . . . i passed C&G 2391 course!
did everyone find out today?
did everyone find out today?
- TL;DR
- C&G 2391 course
Last edited by a moderator:
I also did the exam. does any one have questions about certain questions in the paper. Questions that you may have had thought were difficult?
Sequence of tests after the earth electrode rest?
I just did the exam to! I think it was quite straight forward however im concerned i messed up the question about checking the carpark radial?
Does that just mean 'checks' ie cable condition, earthing, terminations etc and not any testing as it only stated CHECK.
You may of had a different paper to me as as I had to write a sequence of test on the continuity of the car park lights that incorporated 2 core SWA.
I may have struggled?
i did it as well. Trying not to think about it because there's a few questions i think i may have messed up.
I got 'not acceptable' for the first 3 results as well, although earlier in the question i said the tabulated figures can be compared to measured results either by multiplying the tabulated by 0.8, or multiplying the measured results by 1.2, which doesn't work.
What did everyone else put for the voltage to test surge protected sockets?
And the voltage to test between selv and a 400v 3 phase motor?
I just did the exam to! I think it was quite straight forward however im concerned i messed up the question about checking the carpark radial?
Does that just mean 'checks' ie cable condition, earthing, terminations etc and not any testing as it only stated CHECK.
You may of had a different paper to me as as I had to write a sequence of test on the continuity of the car park lights that incorporated 2 core SWA.
I may have struggled?
I'm sure i had a continuity one of the carpark lights too but that was the next question after the check one! God knows il just hope for the best
An office wired 12 years ago, BS88 100A main fuse, wired in pvc singles in pvc conduit and trunking.
5 metal bollards in car park wired in 2 core SWA controlled by a time clock and contactor.
3 phase board next to the service head, TN-S earthing.
A new occupier had just moved in and an EICR needed to be carried out, tested at 20°c.
Can't remember much more than that.