D

Dave-Titan

just got the call . . . . i passed C&G 2391 course!

did everyone find out today?
 
TL;DR
C&G 2391 course
Last edited by a moderator:
Dont forget to look on the Inspection & Testing part of the forum you will find lots of helpful advice.

Here is a good post which may interest you and yes he passed!!!
[h=3]An Awful Feeling This[/h]Good luck with the studies!!!!
 
Upvote 0
It was always recommended by the college tutors on completion of apprenticeship to get some experience of testing out in the field before undertaking the 2391.
Sadly those days have gone with all training being " fast-tracked" now.
 
Upvote 0
As has been stated above if you use the wrong terminology you will lose marks but one point which has not been made is re the symbols in common use.
What I was told by my lecturer was if, for example you're talking about insulation resistance test, you put XXXM then the ohm symbol that's not technically right as you have not explained yourself. What you need to do is write --- Megohms them in brackets (M them the ohm symbol)
That way you have explained what you mean by the use of the abbreviation in the rest of the paper
Sorry I don't know how to get the symbol but hopefully this makes sense
 
Upvote 0
Indeed Trev....and how often have we seen Megohms being refered to as
Mega ohms...its gonna lose you marks.....
 
Upvote 0
ummm fast track 2391!! you pass theory struggle through practical now go and test till your hearts content IF YOU KKNOW HOW!!!
 
Upvote 0
I am doing my 2391 course now in college

I have been set some homework and just want some feedback from a few of you.

I have been asked to give a large list of differences between an industrial installation and a domestic installation.

I have a few but I don't touch industrial at all so not quiet sure of any more

Your advice will be greatly appreciated!
 
Upvote 0
Post the list that you have so far, no doubt you may get a couple of pointers to guide you in the right direction.
 
Upvote 0
well, for a start, and this is basic. with industrial, most installation is surface... tray, trunking, conduit. more technical as regards design. the main criteria is functional rather than aesthetic, and robust equipment, whereas domestic work is more aesthetic with lower loadings, sure you can think of more.
 
Upvote 0
Good luck to all

the wait is the worst i waited 13 weeks for written confirmation and 5 months for the certificate when i did mine june 2010

anyway GOOD LUCK
 
Upvote 0

OFFICIAL SPONSORS

OFFICIAL SPONSORS

Thread statistics

Created
Dave-Titan,
Last reply from
Hristo99,
Replies
1,389
Views
430,301

Electrical Courses

This is the main Electrical Courses at ElectriciansForums.net. Find local recommended electricians courses. Avoid training "company" scams. Always go view the training centre before booking any electrical courses.
Back
Top